background image

Site Preparation

3

Customer Responsibilities

Before installing the system, the customer must perform or provide the following:

When required by NCR, provide the NCR Customer Services representative with
appropriate drawings that indicate:

Equipment location

Site wiring (power and communications, paths and lengths)

Location of other equipment that may generate electrical noise, electromagnetic
interference, or heat

Make building alterations necessary to meet wiring and other site requirements

Provide and install all communications cables, wall jacks, special connectors, and
associated hardware

Provide and install necessary power distribution boxes, conduits, grounds, lightning
protection devices, and associated hardware

Ensure all applicable codes, regulations, and laws (including, but not limited to,
electrical, building, safety, and health) are met

Provide and install auxiliary power or other equipment as required

Provide storage or service areas as required

Meet all system/unit environmental requirements

Provide and install floor coverings and environment systems that limit or control
static electricity build-up and discharge

In general, keep the NCR equipment area free from dust, smoke, lint, and other
particles. Restrict smoking, eating, and drinking around the equipment. Avoid locating
the equipment near other machines that generate ink, carbon, and paper dust particles.

Содержание XL15

Страница 1: ...Site Preparation Guide NCR XL15 5915 BCC5 0000 5163 Issue E...

Страница 2: ...an agreement you have with NCR NCR s copyright notice must be included It is the policy of NCR Corporation NCR to improve products as new technology components software and firmware become available...

Страница 3: ...d batteries according to the manufacturer s instructions Attention Il y a danger d explosion s il y a remplacement incorrect de la batterie Remplacer uniquement avec une batterie du m me type ou d un...

Страница 4: ...trician Improper connection of the equipment grounding conductor can result in a risk of electric shock The conductor with insulation having an outer surface that is green with or without yellow strip...

Страница 5: ...f you do not have access to a computer you may leave a voice message at 1 800 528 8658 USA or International 1 770 623 7400 When leaving a message please provide a phone number and or an email address...

Страница 6: ...he defective equipment Serial Number of the defective equipment Equipment location in the store Description of the problem including any system error codes error condition or guidance to the area of f...

Страница 7: ...R Filler Plate F149 F249 7 With XL Series Stand 5915 F033 F233 8 XL Series Stand 5915 F033 F233 Tilt Angle 17 to 112 8 With Integration Tray Mount 5968 K024 7607 K024 9 Integration Tray Mount 5968 K02...

Страница 8: ...ments 16 Cable Routing 17 Revision Record Issue Date Remarks A Feb 2017 First Issue B Jan 2019 Added JIS MSR F142 F242 VESA Bracket Adapter Plate K330 K331 white features F233 F241 C Sept 2019 Release...

Страница 9: ...fore installing the display This is a contractual document It contains important warnings and confers important legal rights and obligations You are advised to read it carefully It is the responsibili...

Страница 10: ...t remains with the customer For information and guidance purposes only a list is provided in general terms of those matters for which the customer is responsible This list does not intend to be compre...

Страница 11: ...rdware Provide and install necessary power distribution boxes conduits grounds lightning protection devices and associated hardware Ensure all applicable codes regulations and laws including but not l...

Страница 12: ...re changes beyond the restrictions Temperature Parameter Restriction Operating 5 C to 40 C 41 F to 104 F Storage 10 C to 50 C 14 F to 122 F three months Shipping 40 C to 60 C 40 F to 140 F one week Hu...

Страница 13: ...Site Preparation 5 NCR XL15 5915 Display Dimensions With NCR Encrypted USB 3 Track MSR F141 F241 With JIS MSR F142 F242...

Страница 14: ...6 Site Preparation With Enhanced Keypad with MSR F147 F247 With Enhanced Keypad with JIS MSR F148 F248...

Страница 15: ...Site Preparation 7 With Enhanced Keypad with No MSR Filler Plate F149 F249...

Страница 16: ...8 Site Preparation With XL Series Stand 5915 F033 F233 XL Series Stand 5915 F033 F233 Tilt Angle 17 to 112...

Страница 17: ...Site Preparation 9 With Integration Tray Mount 5968 K024 7607 K024 Integration Tray Mount 5968 K024 Tilt Angle 0 to 112...

Страница 18: ...10 Site Preparation With X Series Table Top Stand 5968 K031 X Series Table Top Stand 5968 K031 Tilt Angle 8 to 90...

Страница 19: ...Site Preparation 11 With Checkstand Mount 5968 K039 Checkstand Mount 5968 K039 Tilt Angle 0 to 48...

Страница 20: ...12 Site Preparation With Wall Mount 7702 K320 With Quick Release Bracket 5915 K320...

Страница 21: ...Site Preparation 13 With VESA Bracket Adapter Plate 5915 K330 K331 XL Series Stand Dimensions...

Страница 22: ...14 Site Preparation Pole 5915 K400 Dimensions...

Страница 23: ...ration 15 Weight Component kg lbs NCR XL15 5915 Display 3 4 7 5 Shipping Weight and Dimensions Component kg lbs Length x Width x Height NCR XL15 5915 Display 5 7 12 5 572 x 467 x 197 mm 22 50 x 18 40...

Страница 24: ...Consumption Display Typical Standby No Touch 5 70 W 2 18 W Resistive 5 89 W 2 57 W PCAP 5 84 W 2 33 W AC Store Wiring Requirements The customer must provide suitable AC power for the terminals associa...

Страница 25: ...nnectors are located in an opening on the back of the display Cable routing will vary depending on the stand or mount used For more information refer to the Installing the Display section in the NCR X...

Страница 26: ...18...

Отзывы: