![NCR TouchPort 120 Скачать руководство пользователя страница 13](http://html2.mh-extra.com/html/ncr/touchport-120/touchport-120_site-preparation-manual_4810268013.webp)
1-4
Site Preparation
Environmental Requirements
Barometric Pressure
The NCR TouchPort 120 (2368) Kiosk operates within the following barometric pressure
conditions.
•
Maximum operating altitude: 3,000 m (9,843 ft)
•
Operating range of pressure: 105 to 69 kPa (15.2 to 20.0 lb./in.)
Temperature
The NCR TouchPort 120 (2368) Kiosk operates over the following temperature ranges.
Avoid continuous operation at or near the indicated temperature extremes, or in
locations where the temperature changes beyond the restrictions.
Temperature Parameter Restriction
Operating
5° to 45° C (41° F to 113° F), dry bulb
Storage
-10° to 50° C (14° F to 122° F), three months
Shipping
-40° to 60° C (-40° F to 140° F), one week
Humidity
The NCR TouchPort 120 (2368) Kiosk operates within the following humidity ranges.
Avoid continuous operation at or near the indicated humidity extremes, or in locations
where the humidity changes beyond the restrictions. Never expose the kiosk to
condensation.
Humidity Type
Restriction
Relative
10% to 90%
Maximum Change Rate 10% / 60 minutes
Storage
10% to 90% relative humidity, three months
Shipping
5% to 95% relative humidity, one week
Содержание TouchPort 120
Страница 1: ...Site Preparation Guide NCR TouchPort 120 2368 Kiosk Release 1 2 BCC5 0000 5049 Issue D...
Страница 15: ...1 6 Site Preparation Kiosk Dimensions Countertop...
Страница 16: ...Site Preparation 1 7 Global Pedestal Global Pedestal R1 2...
Страница 17: ...1 8 Site Preparation...
Страница 19: ...1 10 Site Preparation Global Pedestal Base Plates...
Страница 20: ...Site Preparation 1 11...
Страница 21: ...1 12 Site Preparation Global Pedestal R1 2 Base Plates...
Страница 22: ...Site Preparation 1 13...
Страница 23: ...1 14 Site Preparation No Base Plate...
Страница 24: ...Site Preparation 1 15 Millwork NCR Millwork...
Страница 25: ...1 16 Site Preparation Customer Millwork...
Страница 29: ...1 20 Site Preparation Cable Routing Cables are routed out through the cable entry hole at the rear of the kiosk...