Site Preparation
1-3
•
Provide and install auxiliary power or other equipment as required.
•
Provide storage or service areas as required.
•
Meet all system/unit environmental requirements.
•
Provide and install floor coverings and environmental systems that limit or control
static electricity build-up and discharge.
In general, keep the NCR equipment area free from dust, smoke, lint, and other
particles. Restrict smoking, eating, and drinking around the equipment. Avoid locating
the equipment near other machines that generate ink, carbon, and paper dust particles.
Third Party Peripheral Certification
Third party peripherals must be certified with the NCR TouchPort 120 (2368) Kiosk or a
potential ESD issue can occur. Third party peripherals include any electrically powered
devices connected to the kiosk that are not an NCR branded product or a certified
solution advocated by NCR. Examples of third party products include PIN pad devices,
printers, external CD-ROM drives, and so forth.
Peripherals tend to be less sensitive to electrostatic damage when directly grounded
through their power cords. If the peripheral is powered by the terminal and has no
dedicated ground, then all of the ESD energy is coupled into the port connection. Some
devices may require the use of an in-line galvanic isolator/surge protector in order to
prevent problems.
The NCR TPP/SCER process is designed to evaluate third party peripherals and
determine whether additional protective devices are needed.
The
NCR Workstation and Peripherals AC Wiring Guide
(BST0–2115–53) contains additional
information on this subject.
LAN Communications
The NCR TouchPort 120 (2368) supports Ethernet 10/100/1000baseT Local Area Network
(LAN) communication protocol. Cat-5 wiring for 100baseT or higher is recommended.
For Ethernet communications wiring specifications, refer to the
Содержание TouchPort 120
Страница 1: ...Site Preparation Guide NCR TouchPort 120 2368 Kiosk Release 1 2 BCC5 0000 5049 Issue D...
Страница 15: ...1 6 Site Preparation Kiosk Dimensions Countertop...
Страница 16: ...Site Preparation 1 7 Global Pedestal Global Pedestal R1 2...
Страница 17: ...1 8 Site Preparation...
Страница 19: ...1 10 Site Preparation Global Pedestal Base Plates...
Страница 20: ...Site Preparation 1 11...
Страница 21: ...1 12 Site Preparation Global Pedestal R1 2 Base Plates...
Страница 22: ...Site Preparation 1 13...
Страница 23: ...1 14 Site Preparation No Base Plate...
Страница 24: ...Site Preparation 1 15 Millwork NCR Millwork...
Страница 25: ...1 16 Site Preparation Customer Millwork...
Страница 29: ...1 20 Site Preparation Cable Routing Cables are routed out through the cable entry hole at the rear of the kiosk...