NCR SelfServ 22e ATM Site Preparation
2
How to Use This Site Preparation Bookset
The site preparation is part of the
NCR SelfServ 22e ATM Site Preparation Bookset
. It acts
both as a specifications book, and also as a gateway to the other book in the bookset,
which is:
NCR SelfServ 22, 22e, 25, 26, 28, 31 and 36 Site Requirements
Purpose and Audience
This book is intended for architects and those responsible for preparing a site prior to the
arrival of the ATM.
Site Compliance
This bookset contains the information necessary for the preparation of a site conforming to
NCR specifications. It is very important that the site complies with the requirements
specified in this bookset, because, once the equipment has been installed, deficiencies in
site preparation or the problems caused by these deficiencies are much more difficult to
detect and correct. Further, failure to comply with these requirements or to take proper
steps to protect equipment against risks identified in this bookset may cause serious
damage to the equipment and to the customer’s business.
In addition to the need to comply with the requirements specified, electrical wiring and
mechanical systems must also comply with all relevant codes, laws and regulations.
It is important that the site be prepared by a customer or his agent who is fully conversant
with the special requirements of electronic equipment. The responsibility for ensuring that
the site is prepared in compliance with this bookset remains with the customer.
For information and guidance purposes only, a list is provided, in general terms, of those
matters for which the customer is responsible. This list is not intended to be
comprehensive, and in no way modifies, alters, or limits the responsibility of the customer
for all aspects of adequate site preparation.
NCR staff will be available to answer questions relating to the contents of this bookset but,
except where:
a
the customer has been notified that a full or partial consultancy service is available
and/or that NCR will be willing to undertake a preliminary or final site survey and
b
the customer shall have entered into a formal contract with NCR for provision of the
same
no comment, suggestion or advice offered or not offered about preparation of the site nor
any inspection of the site whether before or after preparation is to be taken as approval of
the location of the site and equipment or of its preparation and NCR will not be liable in
respect of any comment, suggestion or advice given by its staff or in respect of any failure
to give advice.