28
Advantage Install
c. Line up with the indicated bolt holes where the sled rails were previously
installed in the bottom of the Electronic cavity. If installing the B side PSU, install
in the Side B Electronic cavity.
Note:
When placing the PSU assembly, install so that the center printer cable
hole is not entirely covered. Power and Comm cables will be routed through this
opening.