3-54
Installation Procedure
5. Insert the Power Supply Bracket vertically onto the left most DPT Mount Rail as
shown.
Identifying the DPT Mount Rail and mounting holes
Power Supply Assembly after installation on the Electronics Mount Rail
6. Using a 3/8" socket, install the PSU bracket using the retained screw bolts to secure
the Power Supply Assembly to the Electronics Mount Rail. Repeat for the second
side PSU.
Содержание OPTIC 5
Страница 1: ...RETROFIT INSTALLATION GUIDE Optic 5 6001 Tokheim Premier B 6001 0008 8801 497 0513401 Issue B ...
Страница 10: ...viii ...
Страница 12: ...x Revision Record Issue Date Remarks A Oct 2016 First Issue ...
Страница 18: ...1 6 ...
Страница 33: ...Disassembly Procedure 2 21 Location of the four mounting bolts ...
Страница 58: ...2 46 Disassembly Procedure 3 Remove the 7 16 cam nut Location of Cam Nut 4 Remove the Lock Cam ...
Страница 62: ...2 50 ...
Страница 73: ...Installation Procedure 3 61 ...
Страница 90: ...3 78 Installation Procedure Note First PSU in final position facing towards outside of dispenser ...
Страница 100: ...3 88 Installation Procedure ...
Страница 112: ...3 100 ...