background image

5

INSTALLATION GUIDE

FIRST-TIME OPERATION

:

1.

Please check installation site prior to installation work. The unit

is better to be installed near to the source of pollutants or user.

2.

The installation site shall have enough area for unit to have a

smooth airflow.

3.

The unit is not intended for installation near the exhaust air duct

or window.

POWER SUPPLY

:

1.

Power supply shall be available at installation place. Make sure

that power supply frequency is correct.

STANDARDS AND REGULATIONS:

1.

Correctly install unit in accordance with the government

regulations.

2.

For safety concerned, it is not recommended to install unit near

to the fire alert system.

3.

Install electric cord and circuit in accordance with safety

standards and regulations of electric engineering.

INSTALLATION (PLEASE FOLLOW THE PROCEDURES):

1.

Before removing the packaging material, move unit close to the

installation site.

2.

First open the two Screw Coverings at the left side of the Air Inlet

by hand or the cross screwdriver (Figure 1), then loosen the

inside screws by cross screwdriver to open Air Inlet Cover

(Figure 2).

Note: There are two safety strings at the sides of the machine to

connect the machine body with Air Inlet Cover. Loosen

screw to take out Air Inlet Cover.

3.

After opening Cover, take out HEPA Filter from unit and remove

the packaging of HEPA Filter.

4.

Remove the packaging of NCCO Reactor.

5.

Reassemble NCCO Reactor and HEPA Filter into unit (Figure 3).

6.

First install one group of filters--NCCO Reactor and HEPA Filter.

The snapping sound indicates the filters have been correctly

installed.

7.

Install other three groups of filters with the same procedures.

8.

After ensuring filters have been correctly installed, align with and

fit the buckles at the two sides of the back cover. Fasten screws

and close the Screw Coverings by cross screwdriver. Then,

install the unit on ceiling (Figure 4).

9.

Apply four expansion screws of Ø8mm on the pre-installed

location. The four screws should be applied just as shown at

Figure 5. Each screw should have a holding strength of at least

40 kg.

10.

Install the unit on ceiling and the screws shall be at the four

leading screws. Make sure the unit is at least 2 m from the floor.

Firmly fasten all screws to avoid screws from coming loose

during operation.

11.

Connect the power cord with power supply for checking.

Figure 1

Figure 3

Figure 2

Содержание EC920

Страница 1: ...and maintenance work This unit can be used by children aged from 8 years and above and persons with reduced physical sensory or mental capabilities or lack of experience and knowledge if they have be...

Страница 2: ...AND REPLACEMENT 10 TROUBLE SHOOTING 11 PRODUCT SPECIFICATION 12 DEAR VALUED CUSTOMER Thank you for your purchase of the EC920 NCCO Air Treatment Unit For your safety and to optimize the operating con...

Страница 3: ...tinguished Then the unit will restart automatically after the 30 minute sleep 9 If there is no action performed after unit has operated for 1 minute all indicators and the display screen on control pa...

Страница 4: ...S AND COMPONENTS ILLUSTRATION DIAGRAM Control Panel LED Indicator Eco Mode Indicator Display Screen ON OFF Indicator Air Inlet Air Outlet Air Outlet Leading Screw Installation Location Air Speed Reduc...

Страница 5: ...er Figure 2 Note There are two safety strings at the sides of the machine to connect the machine body with Air Inlet Cover Loosen screw to take out Air Inlet Cover 3 After opening Cover take out HEPA...

Страница 6: ...ing leading screws via screwdriver For other steps please refer to the operations at Installation Guide ATTENTION At least two operating personnel shall hold the unit when disassembling equipment to a...

Страница 7: ...tray back until clicking into place NOTE 1 Use 1 x 3V lithium battery of CR2025 2 If battery has not been used for 6 months it may lose the capacity of supplying power 3 If you do not intend to use t...

Страница 8: ...function 2 4 ECO MODE BUTTON It is recommended to select Eco Mode during sleep time where Eo shows at display screen When entering into Eco Mode the air speed will automatically adjust to 03 deaden sp...

Страница 9: ...check where under the Power On state nC displays at control panel once every 5 seconds and the Beep Beep sound will be heard from unit for 10 seconds The blower will operate normally during the time r...

Страница 10: ...actor is covered with dust or oily substances after disassembling the removal capacity of the NCCO Reactor may be badly reduced and should be replaced CLEANING AND MAINTENANCE Always disconnect power...

Страница 11: ...normal It is recommended to use more units or use the unit for a longer time if necessary Filter might require cleaning or replaced Clean or replace filter Air speed at Outlet becomes slow HEPA Filte...

Страница 12: ...able Area m2 20 90 m2 Product Dimensions L x W x H mm 755 x 660 x 200 mm Product Weight kg 21 kg Treatment System Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Pre Filter Static Filter Active Oxygen Generat...

Отзывы: