5
INSTALLATION GUIDE
FIRST-TIME OPERATION
:
1.
Please check installation site prior to installation work. The unit
is better to be installed near to the source of pollutants or user.
2.
The installation site shall have enough area for unit to have a
smooth airflow.
3.
The unit is not intended for installation near the exhaust air duct
or window.
POWER SUPPLY
:
1.
Power supply shall be available at installation place. Make sure
that power supply frequency is correct.
STANDARDS AND REGULATIONS:
1.
Correctly install unit in accordance with the government
regulations.
2.
For safety concerned, it is not recommended to install unit near
to the fire alert system.
3.
Install electric cord and circuit in accordance with safety
standards and regulations of electric engineering.
INSTALLATION (PLEASE FOLLOW THE PROCEDURES):
1.
Before removing the packaging material, move unit close to the
installation site.
2.
First open the two Screw Coverings at the left side of the Air Inlet
by hand or the cross screwdriver (Figure 1), then loosen the
inside screws by cross screwdriver to open Air Inlet Cover
(Figure 2).
Note: There are two safety strings at the sides of the machine to
connect the machine body with Air Inlet Cover. Loosen
screw to take out Air Inlet Cover.
3.
After opening Cover, take out HEPA Filter from unit and remove
the packaging of HEPA Filter.
4.
Remove the packaging of NCCO Reactor.
5.
Reassemble NCCO Reactor and HEPA Filter into unit (Figure 3).
6.
First install one group of filters--NCCO Reactor and HEPA Filter.
The snapping sound indicates the filters have been correctly
installed.
7.
Install other three groups of filters with the same procedures.
8.
After ensuring filters have been correctly installed, align with and
fit the buckles at the two sides of the back cover. Fasten screws
and close the Screw Coverings by cross screwdriver. Then,
install the unit on ceiling (Figure 4).
9.
Apply four expansion screws of Ø8mm on the pre-installed
location. The four screws should be applied just as shown at
Figure 5. Each screw should have a holding strength of at least
40 kg.
10.
Install the unit on ceiling and the screws shall be at the four
leading screws. Make sure the unit is at least 2 m from the floor.
Firmly fasten all screws to avoid screws from coming loose
during operation.
11.
Connect the power cord with power supply for checking.
Figure 1
Figure 3
Figure 2