![Nayar Systems Switch Скачать руководство пользователя страница 9](http://html2.mh-extra.com/html/nayar-systems/switch/switch_manual_3641614009.webp)
3. Installation and start-up
Normally, it is required to have one Nayar Switch more than the total number of lift cars in the
installation. As an example, at an installation with a single lift car, two Nayar Switches are necessary; at
an installation with two lift cars, three Nayar Switch are required. The location of Nayar Switch must be
one near the GSM Smart Router and the other ones, at each lift car of the installation.
Nayar Systems
Switch - 1_en
Page 7 of 19