Preparations
Step 1
Antenna installation. Install the antenna on the base, then plug the connector into the ANT
interface of the base station.
Step 2
Power cable connection. Plug one end of the power cable connector into the base station power
interface, and another end into AC 110/220V power socket.
Step 3
Headset and microphone installation. Plug connectors of headset and microphone into
corresponding interface as required.
Step 4 (Please ignore this step if you don’t need tally function)
Base station and switcher connection. Plug one end of the tally cable connector into the base
station tally interface, and another end into video switcher tally interface.