
INSTALLATION
51
Exhaust
Blind
Condensate
Drain
Intake
Caution
: One short radius elbow = 8 feet, One long radius elbow = 5 feet
Total length (L) = H + W
Required
Load (Btuh)
Model
NR-180(A)
NR-210(A)
NR-240(A)
D=3”
D=4”
D=5”
D=6”
Total length(L: Max. ft)
Till 300,000
2
50
90
100
-
Till 330,000
1
1
50
90
100
-
Till 360,000
2
50
90
100
-
Till 379,000
1
1
50
90
100
-
Till 398,000
2
50
90
100
-
Till 540,000
3
-
60
90
100
Till 559,000
2
1
-
60
90
100
Till 578,000
1
2
-
60
90
100
Till 597,000
3
-
60
90
100
D=
5”
D=6”
D=7”
D=8”
Till 739,000
3
1
70
100
-
-
Till 758,000
2
2
70
100
-
-
Till 777,000
1
3
70
100
-
-
Till 796,000
4
70
100
-
-
Till 995,000
5
56
80
100
-
Till 1,194,000
6
-
67
90
100
Till 1,393,000
7
-
57
78
100
D=7”
D=8”
D=9”
D=10”
Till 1,592,000
8
68
89
100
100
Till 1,791,000
9
60
79
100
100
Till 1,990,000
10
54
71
90
100
Till 2,189,000
11
-
65
82
100
Till 2,388,000
12
-
59
75
93
D=9”
D=10”
D=11”
D=12”
Till 2,587,000
13
69
85
100
-
Till 2,786,000
14
64
79
96
100
Till 2,985,000
15
60
74
90
100
Till 3,184,000
16
56
69
84
100
Содержание NR-180A
Страница 5: ...SAFETY Safety Instructions 5 this...
Страница 7: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 15: ......
Страница 17: ......
Страница 19: ......
Страница 20: ...INSTALLATION Locating the Water Heater 20 or follow local codes...
Страница 21: ......
Страница 23: ......
Страница 24: ...INSTALLATION Pressure Relief Valve 24 Pressure Relief Valve Shut off Valve...
Страница 25: ......
Страница 26: ......
Страница 31: ......
Страница 32: ...INSTALLATION Venting 32 ground or local codes...
Страница 33: ...INSTALLATION 33 Venting...
Страница 34: ......
Страница 35: ...INSTALLATION 35 Venting Clearances 1 Natural Natural...
Страница 37: ...INSTALLATION 37 Venting Indoor Installation...
Страница 38: ...INSTALLATION Venting 38 12 Min Exhaust 12 minimum from any obstruction above below left or right Intake...
Страница 39: ...INSTALLATION 39 Venting CONCENTRIC VENT TERMINATION 1 Sidewall Installation 2 Roof Installtion...
Страница 40: ...INSTALLATION Venting 40...
Страница 42: ......
Страница 43: ......
Страница 44: ...INSTALLATION PCB Board Settings 44...
Страница 45: ...INSTALLATION 45 CascadeConnectionandSet upProcedures...
Страница 46: ...INSTALLATION 46...
Страница 47: ...INSTALLATION 47...
Страница 50: ......
Страница 55: ...INSTALLATION 55...
Страница 56: ...INSTALLATION 56...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 61: ......
Страница 63: ......
Страница 65: ......
Страница 68: ...OPERATION Navien America Inc Limited Warranty 68 12 Grains of hardness may...
Страница 69: ...OPERATION 69 Model Description Legend...
Страница 70: ...OPERATION General Parts 70 Condensate Water...
Страница 71: ...OPERATION 71 General Parts Condensate Water...
Страница 72: ...OPERATION Remote Controller 72 Hot Water In Use Indicator...
Страница 74: ...OPERATION OPERATION Setting the Clock 74 Hour Minute...
Страница 79: ...OPERATION 79 A Series Recirculation Timer Setting 74...
Страница 81: ...OPERATION 81 Lock Function Setting...
Страница 82: ...OPERATION Well Pump setting function 82...
Страница 85: ......
Страница 89: ...OPERATION 89 A Series External Recirculation Mode...