manualshive.com logo in svg
background image

 

 

Quick Installation Guide 

Model 

NHB-055/080/110/150 

 

STEP 1  Before Installing 

 

Read the Installation & Operation Manual before 
installing.   
This product must be installed and serviced by a licensed 
plumber, a licensed gas fitter, or a professional service 
technician. Navien is not liable for any damages or defects 
resulting from improper installation. 

 

 

 

 

Safety 

 

DO NOT install the boiler in areas with excessively high humidity.

 

 

 

Location Requirements 

Select the best location on “Choosing an Installation” in the installation 
Manual. 

 

Allowable minimum clearances 

 

 
 
 

STEP 2    Installing 

  Unpacking 

 
 

 

  Checking the Rating Plate 

 

 

This boiler is configured for Natural Gas 
from the factory. If conversion to Propane 
Gas is required, the conversion kit supplied 
with the boiler must be used. 

 

 

  Mounting on the Wall 

 

 

 

  Removing the Front Cover 

 

 

 

Remove the 
4 screws 

Drill in the supplied anchor bolts 
after considering where the vent 

termination will be located. 

  CAUTION

 

Do not install the boiler on dry walls without proper reinforcement. 

 

WARNING

 

 

Before connecting the gas supply, determine the gas type and 
pressure for the boiler by referring to the rating plate. Use only the 
same gas type indicated on the rating plate. Using a different gas 
type will result in abnormal combustion and malfunction of the 
boiler. Gas supplies should be connected by a licensed professional 
only. 

 

The appliance and its gas connection must be leak tested before 
placing the appliance in operation. 

 

This boiler cannot be converted from natural gas to propane or vice 
versa without a Navien gas conversion kit. Do not attempt a field 
conversion of this boiler without a Navien gas conversion kit. Doing 
so will result in dangerous operating conditions and will void the 
warranty. 

Navien America Inc. is not liable for any property damage and/or 
personal injury resulting from improper conversions. 

Clearance  Indoor Installation 

Top 

9 in (229 mm) minimum 

Back 

0.5 in (13 mm) minimum 

Front 

4 in (100 mm) minimum 

Sides 

3 in (76 mm) minimum 

Bottom 

12 in (300 mm) minimum 

 

Top 

Back 

Side 

Side 

Front 

Bottom 

 

WARNING

 

Follow all local codes and/or the most recent edition of the National Fuel Gas Code 
(ANSI Z223.1/NFPA 54) in the USA, or the Natural Gas and Propane Installation Code in 
Canada (CAN/CGA B149.1). 

 

Installation & Operation Manual 
User’s Information Manual 

 

Vent terminators 

 

Wall flanges 

 

Spare Parts 

 

Tapping screws and anchors 

 

Wall mounting bracket 

 

Air vent 

 

Conversion Kit 

 

Pressure Relief Valve (Heating) 

 

Outdoor Temperature Sensor 
and Cable 

 

Air Vent Bushing (3/4” to 1/2”) 

 

 

 

Lift up the boiler, rest the unit on the hooks 
provided on the wall bracket on the wall.   

Then, install 2 fix screws through the bottom 
bracket to secure the boiler to the wall.   

 

Secure the mounting 
bracket to the wall with 
the tapping screws and 
anchors. 

Содержание NHB-55

Страница 1: ...boiler Gas supplies should be connected by a licensed professional only The appliance and its gas connection must be leak tested before placing the appliance in operation This boiler cannot be converted from natural gas to propane or vice versa without a Navien gas conversion kit Do not attempt a field conversion of this boiler without a Navien gas conversion kit Doing so will result in dangerous ...

Страница 2: ...verheating Make up Water Pressure Relief Valve A pressure relief valve must be installed when installing pipings for a heating system From System Air Vent Cap Space Heating Return Before filling the boiler remove the air vent cap to allow the system to fill properly Replace the cap when the system is full The Navien NHB boilers have a top connection for an air vent An air vent must be installed to...

Страница 3: ...low Navien recommended venting materials Locale Recommended Vent Materials USA PVC Schedule 40 Solid core CPVC Schedule 40 or 80 Solid core Approved Polypropylene Canada Type BH Special Gas Vent Class IIA PVC Type BH Special Gas Vent Class IIB CPVC Type BH Special Gas Class IIC Polypropylene For installation in Canada field supplied plastic vent piping must comply with CAN CGA B149 1 latest editio...

Страница 4: ...mal operation mode 5 Run space heating The gas in the gas supply line will be purged 6 Leave the boiler on until the boiler shuts down due to a lack of gas supply and then turn off the boiler Power ON Adjust Temperatures View Basic Information Resetting the Boiler When the power is on the boiler supply water temperature will appear with the water pressure on the front panel display at 5 second int...

Отзывы: