background image

Venting 

Electrical 

C

onnections 

 

External LW

C

C

onnection  

(

if required by local codes

)

 

Power 

C

onnection 

1

20

 VA

C

 6

0

 Hz 

Min. 

2

 Amp current with proper 

grounding 

C

AUTIO

N

 

Using abnormally high or low 
AC voltage may cause 
abnormal operation, thereby 
causing fire which reduces the 
life expectancy of this product. 

Safety 

DO NOT 
touch the 
power 
cord with 
wet hands. 

DO NOT allow 
the boiler to be 
exposed to 
excessive 
amounts of 
water. 

Front Panel Dip Switch 

2

 

(

Set of 

2)

 

 

SW  Function 

Setting 

2 Gas 

Type 

Natural 

Gas 

2-OFF 

Propane Gas

2-ON 

P

CB

 Dip Switch 

2

 

(

Set of 

8)

 

 

SW  Function 

Setting 

1 Temperature 

Control 

Return Water  1-ON 

Supply Water  1-OFF 

7 Thermostat 

or Zone 
Controller 

Unused 
(Permanent 
Space 
Heating 
Demand) 

7-ON 

Used 7-OFF 

8 Exhaust 

Thermostat 

Temperature 
Limit Unused 
(CPVC) 

8-ON 

Setting (PVC)  8-OFF 

 

Front Panel Dip Switch 1 

(

Set of 1

0)

 

 

SW  Function 

Setting 

2 Temperature 

Unit 

°C (Celsius) 

2-ON 

°F (Fahrenheit)  2-OFF 

3 Well 

Pump

On 

3-ON 

Off 3-OFF 

4 & 5  High Altitude*  0-1,999 ft 

 (0-609 m) 

4-OFF,  
5-OFF 

2,000-5,399 ft   
(610-1,645 m) 

4-ON,  
5-OFF 

5,400-7,699 ft 
(1,646-2,346 m) 

4-OFF,  
5-ON 

7,700-10,100 ft 
(2,347-3,078 m) 

4-ON, 
5-ON 

* Above 2,000 ft (610 m), the boiler will derate by 4% for 
each 1,000 ft (305 m) of altitude gain. 

Refer to your local codes to determine if an 
LWCO device is required for your system and 
ensure that the built-in device meets the 
requirements.  

C

AUTIO

N

 

Disconnect the power to 
the boiler before installing 
any wire connections on 
the main PCB. 

C

onfirmation of Panel DIP Switch Settings 

Horizontal vent termination 

Interior view 

Intake Air

Exhaust Gas 

Exterior view 

12"(300mm)min. 

Venting Length 

3” pipe venting 

2

” pipe venting 

12"(

30

0mm)

m

in.

 

C

oncentric Vent Termination 

Sidewall installation 

Vent

Combustion Air

Combustion Air 

1" (25mm) min 

Maintain 12" min. 
clearance above 
highest anticipated 
snow level or grade. 

Roof installation 

Vent 

Maintain 12" min.   
(18" min. for Canada) 
clearance above highest 
anticipated snow level 
maximum of 24" above 
roof. 

Combustion

Air

Vent 

Combustion Air 

Maximum number   
of elbows: 6 

Maximum number   
of elbows: 8 

2-to-3-inch 
reducer 

Maximum Length 150' 

Maximum Length 60' 

90   elbow = 5 linear feet of venting 
45   elbow= 3 linear feet of venting 

90   elbow = 8 linear feet of venting 
45   elbow= 4 linear feet of venting 

Vertical vent termination 

Sidewall vent termination 

Vent Termination Options 

Exhaust Vent Piping Materials 

All Navien boilers are Category IV appliances. 
The venting system should be approved for use with Category IV 
appliances (typically Type BH Special Gas Vent approved by UL 1738-S636). 
Venting requirements in the USA and Canada

ent (see below). 

N

avien recommended venting materials 

Locale Recommended 

Vent 

Materials 

USA

PVC Schedule 40(Solid core) 
CPVC Schedule 40 or 80(Solid core) 
Approved Polypropylene

Canada* 

Type BH Special Gas Vent Class IIA (PVC) 
Type BH Special Gas Vent Class IIB (CPVC) 
Type BH Special Gas Class IIC (Polypropylene)

*  Approved polypropylene systems include:
  Durevent Polypro (Single Wall): 2PPS-xxx (2”), 3PPS-xxx (3”)
 Centrotherm 

I

W: ISxx02xx (2”), ISxx03xx (3”)

  Refer to manufacturer’s literature for detailed information.
** For installation in Canada

ld-supplied plastic vent piping must comply

  with CAN/CGA B149.1 (latest edition) and be cer

to the Standard

  For Type BH Gas Venting Systems, ULC-S636. Components of this listed
  system must not be interchanged with other vent systems or unlisted
 pipes 

or ttings. All plastic components a

s and glues

 of 

the 

ed vent system must be from a single system manufacturer

  and must not be intermixed with another system manufacturer’s parts.
  The supplied vent connector and vent termination are cer

s part

  of the boiler.

Отзывы: