26
|
Wiring the radar system
4.4
Radar processor 2 kW: Connect the interconnection cable to
the radar processor
If the Interconnection cable is not attached or needs to be changed use the following steps
Run the 2 kW interconnection cable (either the standard 15 m [49 ft] or the optional 20 m [65.5
ft] cable) from the scanner to the radar processor.
Push the round connector (A) of the 2 kW interconnection cable into the scanner connection on
the radar processor and tighten the locking nut.
The interconnection cable pin details are provided here for information, in case the connector
needs to be removed to feed the cable
.
The front view of the 2 kW interconnection cable is shown above.
2 kW interconnection cable pin details
Pin
Color/Name
Signal name
AWG size
1 Green
(thick)
Power
#12
2
Yellow (thick)
Power GND
#12
3 Green
(thin)
Pulse
width
#24
4 Clear
coax
signal Video
#24
5
Drain wire for 4
Video GND
#24
6
Drain wire for 7
Trig GND
#24
7
Black coax signal
Trig/STC
#24
8
White
BZ Tune to scanner
#24
9
Yellow
Tune from scanner
#24
10
White (thick)
No connection
#12
Shell Braid
shield
Содержание 2kW
Страница 2: ......
Страница 13: ...Install the radar 11 1 Product registration card CD000085 1 Warranty card CD000260 4 Mounting screws HR000061 ...
Страница 71: ...Drawings 69 11 1 Radar scanner 2 kW dimensions 11 Drawings ...
Страница 72: ...70 Drawings 11 2 Radar scanner 4 kW Dimensions ...
Страница 73: ...Drawings 71 11 3 Radar processor Dimensions ...
Страница 79: ......
Страница 80: ...Navico Radar 2kW and 4kW Installation manual English Doc no MN000783A G ...