background image

 

www.NavePoint.com 

[email protected] 

4.

 

Equipment Installation 

1 Rack Unit 

 

          

 

 

-

Squared Hole Mounting

 

 

 

 
 

 
 

 

 
 

 

 
 

 

 

 

Locate the numbered square openings in the Vertical Rack Rails (G) where you plan to install your equipment. 

Install silver M6 Cage Nuts (M) into the square openings to provide an attachment point for the M6 Mounting 

Screws (L) . Note: Consult your equipment documentation to determine how many cage nuts will be required 

and where they will need to be installed. 

a- 

From the inside of the Vertical Mounting Rails (G), insert one of the flanges of the cage nut through the 

square opening. Press it against the side of the square opening.  

b- 

Compress the cage nut at the sides slightly to allow the remaining flange to fit through the square opening. 

When the cage nut is properly installed, both flanges will protrude through the square opening and will be 

visible  on  the  outer  surface  of  the  mounting  rail.  Repeat  steps  1a  and  1b  until  all  required  cage  nuts  are 

installed.

 

After  installing  the  required  cage  nuts,  use  the  included  silver  M6  Mounting  Screws  (L)  to  secure  your 

equipment into the installed M6 Cage Nuts (M). 

 

 

 

Отзывы: