background image

 

www.NavePoint.com 

[email protected] 

-

Leveling

 

Level the cabinet before attempting to install any equipment into the cabinet. The casters are not designed to provide 

long-term support for the cabinet. Use the levelers to provide long-term support. Install the cabinet in a structurally 

sound area with a level floor that can bear the weight of the cabinet, all equipment that will be installed in the cabinet 

and any other cabinets and/or equipment that will be installed nearby. 

 

 

1: After the cabinet has been moved to the 

installation location, use a carpenter's level 

to check the slope of the floor. If the slope is 

excessive, choose an alternative location. 

 

2:  Use  an  open-end  wrench  to  lower  each 

leveler  until it contacts the floor. 

 

3.

 

Enclosure Configuration 

-Door Locks

 

 

 

The  front/back  door  and  4  side  panels  contain  locks  that  are 

lockable with the included keys.

 

 

Содержание 42U

Страница 1: ...tore mount equipment please ensure the equipment stored mounted does not exceed the specified weight capacity Limitations of Liability In no event will NavePoint LLC be liable for any damages whether direct or indirect special punitive incidental or consequential damages including but not limited to lost profits or revenue loss of use lost business opportunities or loss of goodwill or for the cost...

Страница 2: ... com 1 Feature Identification 1 Front Door Perforated or Glass 2 Back Door 3 Removable Side Panel 4x 4 Top Panel Fan Compatible or Cable Management 5 Bottom Panel 6 Vertical Mounting rails 4x 7 Cable Management Rails 2x 8 Casters 4x 9 Levelers 4x ...

Страница 3: ...ARNING Two people should remove the cabinet from the pallet Be extremely careful when moving the cabinet 2 Position at least one person at the front of the cabinet and one person at the rear of the cabinet Slowly push or lift the enclosure off the side of the shipping pallet Use the casters to move the cabinet for a short distance over a level smooth stable surface by pushing it from the front or ...

Страница 4: ... bear the weight of the cabinet all equipment that will be installed in the cabinet and any other cabinets and or equipment that will be installed nearby 1 After the cabinet has been moved to the installation location use a carpenter s level to check the slope of the floor If the slope is excessive choose an alternative location 2 Use an open end wrench to lower each leveler until it contacts the ...

Страница 5: ... s perpendicular to the Front Frame of the cabinet 2 Disconnect the door s ground wire 3 Lift the door from the hinges and remove it from the Front Frame of the cabinet 4 Remove the door hinges from the Front Frame 5 Rotate both hinges 180 degrees and attach them on the opposite side of the Front Frame ...

Страница 6: ...otate the Front Door 180 degrees 7 Unscrew the Front Door Lock and rotate it 180 degrees Reattach the Front Door Lock into the Front Door 8 Unscrew two hinges inside of the Front Door then reattach each of them using the holes above the original position ...

Страница 7: ... keys 2 Remove Side Panels by sliding the plastic latch downward Adding or Removing Top Panel WARNING Do not attempt to use the roof panel for weight bearing purposes Do not attempt to add or remove the roof panel without assistance From inside of the enclosure Pull the 2 pins near the rear of the roof panel and push the roof panel upward ...

Страница 8: ...ch Vertical Mounting Rail is connected to the enclosure with 6 screws 1 pair at the top beam 1 pair at the middle beam and 1 pair at the bottom beam 2 Adjust the rails by sliding them to the desired depth and secure them with the 6 screws described above 3 Slide the mounting rails to the desired depth and reattach them The depth of the 2 Cable Management Rails can be adjusted using the same method...

Страница 9: ...ady contain screws 1 As shown in above picture remove the Front Door Back Door and Side Panels of cabinets 2 Remove the screw from each baying point B 3 Loosen the screw in each baying bracket and turn each bracket 90 degrees toward the adjoining cabinet aligning each bracket with the corresponding baying connection point on the adjoining cabinet If you want to leave a 10mm gap between two cabinet...

Страница 10: ...hipping charges and insurance are not covered and are the responsibility of the purchaser Any labor charges and related expenses for the removal installation or replacement of the product or its parts are not covered under this warranty NavePoint reserves the right to make substitutions to warranty claims if parts are unavailable or obsolete NavePoint shall not be liable for loss of use of the pro...