3
4
Create and Attach Right Frame to the Left Frame.
a. Connect the other Bottom Adjustable Frame and Left Vertical Rail
(A) and Right Vertical Rail (B) to the Base Brackets (C) with 4 M8 Bolts
(J)
b. Connect the other Top Adjustable Frame and Left Vertical Rail (A)
and Right Vertical Rail (B) to the Top Support Brackets (I) using 4 M8
Bolts (J).
Optional Step: Install Cable Manage-
ment Hooks (L) to Vertical Rails with Hook
Mounting Screws (M).
Finished.
L
M