8
9
www.vexve.com
www.vexve.com
Attach the draining valve with hose to Frame II and close the draining valve.
Before drilling through the main pipe, test that the valve can be closed: release the shaft’s locking
mechanism by pulling the spring loaded part # 400012 (see page 6) and slide out the shaft until it
mechanically stops at the outermost position. Close and open the hot tapping valve to verify it is working
properly.
Select a locking position that corresponds to the size of the hot tapping valve and lock the shaft to the
selected position (three alternatives —> see page 6).
3. Hot tapping
3.1.
Checklist for power drill
· the rotation direction must be clockwise
· the percussion function must not be on under any circumstances
· select rotation speed: area 1 or 2 (see figure 5)
· set RPM, scale A - F (see figure 6).
Figure 5.
Figure 6.
Содержание DN 25
Страница 1: ...Instructions for Naval hot tapping equipment and valves...
Страница 6: ...6 www vexve com 2 1 Exploded view...
Страница 22: ...22 www vexve com...
Страница 23: ...23 www vexve com...