
01
PREPARATION
01
03
CONTENTS
PREPARATION
OPERATING INSTRUCTIONS (DRILL DRIVEN)
OPERATING INSTRUCTIONS (MANUAL)
MAINTENANCE
APPLICATION
OPERATING INSTRUCTIONS
(
DRILL DRIVEN)
-
Make sure flaring cone is at the upper most
position by turning flaring yoke counterclockwise.
-
Turn tension rod counterclockwise until it is
backed away from the inner chamber of the flaring
body.
-
Lightly lubricate flaring cone with vacuum pump
oil.
1. Pull off the flare handle.
2. With the hex screws facing down on the flaring
bar, open the flaring bar and insert the flaring bar
into the flaring body where the arrow is pointed.
3. Once inserted pull forward and open the flaring
bar
Flaring Bar
Tension Rod
Flaring Yoke
Assembly
Tubing Depth
Stopper
Tubing
Tubing Size
01
05
05
Step 2
Step 3
4. Place the tubing depth stopper at the right size.
Insert copper tubing up to the tubing depth
stopper.
Flare
Handle
Hex screws