9
Operation Procedures
Knowledge of the proper operation of the MX3-500RP is required to
ensure user safety and efficient performance of the extractor.
SET UP AND OPERATION
1. Electrical Cords:
Two 25’ power cords are supplied with the Nautilus MX3-500RP. The amperage required by each cord
requires that the two cords be plugged into separate circuits:
•
Cord #1 (Left side) will supply power to vacuum #1, solution pump and cooling fan.
•
Cord #2 (Right side) will supply power to vacuum #2 and the optional waste pump if so equipped.
This machine should be able to run when both cords are connected to separate 15amp circuits. Other
electrical equipment is connected to the circuit during operation; 20amp circuits may be required.
20amp circuits are usually found in kitchens and bathrooms.
An overloaded circuit will not trip the
circuit breaker immediately, but may not provide sufficient voltage for proper operation and the breaker will
trip eventually.
Plug the two power cords into two outlets from different circuits. If the Dual Circuit Indicator green light
fails to light, you may be on the same circuit and may need to select a different plug for one of the cords. If
the Dual Circuit Indicator green light comes on, you are plugged into two different circuits. Proceed with
your set-up procedure.
(Dual Circuit Indicator light may take up to 30 seconds to recognize the two circuits and turn ON.)
If a circuit breaker trips or the pump circuit breaker trips during operation, reset the breakers and move the
cord to another outlet as needed.
Power Cord – AX32
25’ – 12 gauge M-F Plugs
Cord #1
Cord #2
Dual Circuit Indicator Light
Содержание MX3-500RP
Страница 1: ...1 LMANN14 Revised 06 04 2014 Nautilus MX3 500RP Operating Manual...
Страница 38: ...38 OPTIONAL AUTO FILL FLOAT VALVE ASSEMBLY NM5740...
Страница 40: ...40 Pump Out Pump PARTS ASSEMBLY...
Страница 41: ...41 1 2 3 5 4 4 6 7 8 9 10 11 12 3 8 9 8 9 8 9 39 2...
Страница 45: ...45 48 49 49 47 47 47A 47 47A 47 47A 47A 51 51 37 9 54 64 9 54 64 9 54 64 52 VACUUM MOUNTS CONNECTIONS...
Страница 48: ...48 2 39 1 72 73 73 67 9 30 31 82 83 2 83 82 84 INSIDE SOLUTION TANK BOTTOM VIEW SOLUTION TANK...
Страница 50: ...50 92 91 95 94 112 13 14 14A 104 105 1 39 PUMP OUT CONNECTIONS...