![background image](http://html1.mh-extra.com/html/nautilus/extreme-mxe-200/extreme-mxe-200_operating-manual_711729026.webp)
26
Maintenance
Proper maintenance is required to keep the MXE-200 operating properly, prevent
downtime and to extend the life of your equipment.
This machine is an electrical appliance.
Care must be taken to reduce the risk of electrical shock.
Disconnect electrical power before performing any service or
maintenance inside machine base or before testing or repairing switches or power
cords. Failure to do so may result in severe personal injury or death.
OPERATION
INTERVAL Page #
CLEAN CHEMICAL FEED FILTER & FOOT VALVE Daily – After Each Job
27
CLEAN VACUUM SHUTOFF ASSEMBLY SCREEN
Daily – After Each Job
27
CLEAN HYDRO-FILTER II
Daily – After Each Job
28
RINSE OUT RECOVERY TANK
Daily
28
CLEAN WASTE PUMP-OUT PUMP
Daily
29
FLUSH SOLUTION TANK AND PUMP
Daily
29
CLEAN PUMP-INLET FILTER
Weekly – As needed
30
FLUSH CHEMICAL SYSTEM
Monthly
31
CLEAN DRAIN VALVE
As needed
32
STORAGE PREP – FREEZE PROTECTION
As needed
33
Section
3
Содержание Extreme MXE-200
Страница 1: ...1 LMANN08 Revised 01 29 2015 Nautilus MXE 200 Operating Manual EXTREME ...
Страница 23: ...23 M1200 Wiring Diagram Nautilus MXE 200 Wiring Diagram Cord 1 ...
Страница 37: ...37 OPTIONAL AUTO FILL FLOAT VALVE ASSEMBLY NM5740 ...
Страница 38: ...38 Pump Out Pump PARTS ASSEMBLY ...
Страница 39: ...39 1 4 4 6 7 8 9 10 11 3 3 8 9 12 8 9 39 8 9 2 2 5 ...
Страница 47: ...47 85 86 87 101 86 102 1 VACUUM SHUTOFF ASSEMBLY INSIDE RECOVERY TANK WITHOUT OPTIONAL PUMP OUT 85 87 111 ...
Страница 49: ...49 92 91 95 94 112 13 14 14A 104 105 1 39 PUMP OUT CONNECTIONS ...
Страница 50: ...50 35 36 36A 78 36 36A 34 39 127 128 129 2 1 130 32 34 119 39 131 ...