![Nautel NX3 Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/nautel/nx3/nx3_installation-manual_711214050.webp)
NX5/NX3 INSTALLATION MANUAL
COMMISSIONING TASKS
PAGE 2.8.8
VERSION 3.1 2021-04-22
4.
Turn on the audio signal generator and increase the output level of the audio signal generator until
a modulation depth of 100% is attained, as indicated on the modulation monitor. The audio signal
generator's output level should be at the user-defined input level (e.g., 10 dBm) set in the preset.
5.
Use the modulation monitor to verify that the RF output's modulation envelope is acceptable.
6.
Check the ac sample voltage using either the local front panel UI (
Main Menu-> View Status ->
View Meters -> Rack
) or the remote AUI (click
Meters
, then select
Rack 1
and then select AC
Sample). It should be between 297 V and 321 V.
7.
Set the output level of the audio signal generator to zero (off).
8.
Turn off the RF power stage: press
RF Off
. The
RF Off
button’s LED will turn amber.
9.
Disconnect the audio signal generator from J7 or J9 on the control/interface PWB.
Содержание NX3
Страница 2: ......
Страница 4: ......
Страница 8: ...NX5 NX3 INSTALLATION MANUAL PAGE 2 VIII VERSION 3 1 2021 04 22...
Страница 32: ...NX5 NX3 INSTALLATION MANUAL ADJUSTING THE SPARK GAP PAGE 2 5 4 VERSION 3 1 2021 04 22...
Страница 42: ...NX5 NX3 INSTALLATION MANUAL INSTALLING CONTROL MONITOR WIRING PAGE 2 7 6 VERSION 3 1 2021 04 22...
Страница 54: ...NX5 NX3 INSTALLATION MANUAL COMMISSIONING TASKS PAGE 2 8 12 VERSION 3 1 2021 04 22...
Страница 58: ...NX5 NX3 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 9 4 VERSION 3 1 2021 04 22...
Страница 69: ......