![Nautel NV7.5 Скачать руководство пользователя страница 162](http://html1.mh-extra.com/html/nautel/nv7-5/nv7-5_operation-and-maintenance-manual_3552316162.webp)
NV10/NV7.5 Operations and Maintenance Manual
Routine maintenance
Page 3-8
Issue 3.4 2016-08-03
2. Open the front door and disconnect all interconnecting cables and remove the
associated exciter from the transmitter. See Figures MD-1 in the mechanical drawings
section at the end of the
NV10/NV7.5 Troubleshooting Manual
to locate the exciters.
See Figure MD-5 to locate the NVE exciter PWB (A1).
3. Place the exciter on a bench and gain access to the appropriate exciter’s NVE exciter
PWB (A3A1 or A4A1) by removing the cover.
4. Replace the battery in XBT1 on the NVE exciter PWB and replace the exciter’s cover.
5. Install exciter in the transmitter and re-connect all cabling.
6. Close the front door.
7. Check for any alarms on the AUI. Battery related alarms should clear. (See
transmitter status” on page 2-66
Inspecting lightning protection systems
You should inspect the lightning protection systems that are connected to your NV10/NV7.5
transmitter, ac power, RF feedline, antenna and tower periodically to ensure that your site,
equipment and personnel are fully protected.
Interval
Every 6 months.
Parts and tools
Depends on your site, but may include a digital multimeter, ladder, binoculars, and continuity
tester.
Procedure
Perform the following steps to test the lightning protection systems:
1. Test the continuity between ground available at your lightning arrestor and ground
available on various pieces of equipment connected to the transmitter. Ensure that
there is no resistance (near 0 ohms, accounting for multimeter test lead resistance).
Содержание NV7.5
Страница 2: ......
Страница 4: ......
Страница 8: ...NV10 NV7 5 Operations and Maintenance Manual Page viii Issue 3 4 2016 08 03...
Страница 12: ...NV10 NV7 5 Operations and Maintenance Manual Page xii Issue 3 4 2016 08 03...
Страница 20: ...NV10 NV7 5 Operations and Maintenance Manual Page xx Issue 3 4 2016 08 03...
Страница 28: ...NV10 NV7 5 Operations and Maintenance Manual Description Page 1 8 Issue 3 4 2016 08 03...
Страница 32: ...NV10 NV7 5 Operations and Maintenance Manual Issue 3 4 2016 08 03 Page 1 12...
Страница 38: ...NV10 NV7 5 Operations and Maintenance Manual Operating the transmitter Page 2 6 Issue 3 4 2016 08 03...
Страница 40: ...Issue 3 4 2016 08 03 Page 2 7 Page 2 8 Blank...
Страница 164: ...NV10 NV7 5 Operations and Maintenance Manual Routine maintenance Page 3 10 Issue 3 4 2016 08 03...
Страница 181: ...NV10 NV7 5 Operations and Maintenance Manual List of terms Page 5 4 Issue 3 4 2016 08 03...
Страница 182: ......