
NG1000 Troubleshooting Manual
Issue 0.4 2010-10-12
Page xv
About safety
All Nautel transmitters are designed to meet the requirements of
EN60215, Safety Requirements for
Radio Transmitters
.
The philosophy of
EN60215
is that the removal of any cover or panel that can only be opened using
a tool is a maintenance activity, and that any person performing a maintenance activity is expected to
be trained for that activity. Under
EN60215
, it is assumed that trained personnel will be
knowledgeable and will take precautions such as removing all power to the transmitter before
accessing its components.
Electrical hazards
To remove power from the transmitter, switch off and lock out the ac power. There is an amber
LED in each ac distribution assembly at the bottom rear of the cabinet that glows to remind anyone
who has not turned off the power that the system is live and serious danger is present.
Mount the transmitter ac power disconnect switch/breaker close to the transmitter so that it can be
reached quickly in an emergency. Clearly label the disconnect switch/breaker (e.g.,
EMERGENCY
SWITCH
).
After turning off the power, always perform a measurement to confirm that the power is off before
touching anything within the transmitter. If the wrong breaker was opened, the equipment will be
live.
Use only a non-contact voltage probe or a safety voltmeter (available from vendors such as Fluke,
Ideal, and Teagam).
Use a proper lockout procedure to ensure that another worker cannot accidentally reapply power
while you are performing maintenance on any part of the transmitter or site.
WARNING: It is not enough to remove RF power. The power line is still
connected.
WARNING: Do not use an ordinary multimeter to check for voltage,
since it may have been left inadvertently on the AMP (A) range,
triggering a short and an arc blast that could result in severe burns
and even death.
Содержание NG1000
Страница 2: ......
Страница 4: ......
Страница 7: ...NG1000 Troubleshooting Manual Table of contents Issue 0 4 2010 10 12 Page vii List of terms 6 1 ...
Страница 8: ...NG1000 Troubleshooting Manual Table of contents Page viii Issue 0 4 2010 10 12 ...
Страница 10: ...NG1000 Troubleshooting Manual Page x Issue 0 4 2010 10 12 ...
Страница 14: ...NG1000 Troubleshooting Manual Page xiv Issue 0 4 2010 10 12 ...
Страница 22: ...NG1000 Troubleshooting Manual Page xxii Issue 0 4 2010 10 12 ...
Страница 56: ...NG1000 Troubleshooting Manual Responding to alarms Page 1 34 Issue 0 4 2010 10 12 ...
Страница 122: ...NG1000 Troubleshooting Manual Wiring connector lists Page 3 10 Issue 0 4 2010 10 12 ...
Страница 128: ...NG1000 Troubleshooting Manual Reading Electrical Schematics Page 4 6 Issue 0 4 2010 10 12 ...
Страница 153: ...Issue 0 4 2010 10 12 MD 6 Figure MD 6 NAPE82 Exciter Control PWB ...
Страница 159: ...Issue 0 4 2010 10 12 MD 12 Figure MD 12 NAPA24 PA PWB C1 C2 C8 Q1 ...
Страница 162: ...NG1000 Troubleshooting Manual List of terms Page 6 2 Issue 0 4 2010 10 12 ...
Страница 163: ......