![Nautel NARF79 Скачать руководство пользователя страница 75](http://html1.mh-extra.com/html/nautel/narf79/narf79_installation-manual_711190075.webp)
VX150 TO VX2 INSTALLATION MANUAL
PRE-INSTALLATION / INSTALLATION ASSISTANCE
VERSION 0.3 2021-01-14
PAGE 1.13.1
SECTION 1.13: PRE-INSTALLATION / INSTALLATION
ASSISTANCE
Nautel provides a number of support options to help you during pre-installation planning and
preparation:
Installation and Commissioning Service
Online Documentation - see page 1.13.2
On-Site Support - see page 1.13.3
Standard Warranty - see page 1.13.4
Extended Warranties - see page 1.13.7
Pre-Installation Consulting
Nautel field support specialists are available to answer questions and work with you to ensure that your
site will be ready for the installation of your VX150 to VX2 transmitter. For support, contact Nautel
Customer Service and request assistance (
“On-Site Support” on page 1.13.3
Installation and Commissioning Service
Nautel offers an installation and commissioning service to customers who want assistance with
configuring and commissioning a new Nautel transmitter. After the customer completes the transmitter
assembly and installation, Nautel technical personnel will spend up to three days on-site to help make
the ac power, RF and remote connections, and to assist with the configuration and testing of Nautel
equipment.
The customer is responsible for ensuring that the following stages of installation have been completed,
prior to the arrival of Nautel personnel:
Ac power wiring for the transmitter has been installed and connected at the transmitter and at the
breaker panel or the building’s service entrance.
Содержание NARF79
Страница 2: ......
Страница 4: ......
Страница 10: ...VX150 TO VX2 INSTALLATION MANUAL PAGE VIII VERSION 0 3 2021 01 14...
Страница 14: ...VX150 TO VX2 INSTALLATION MANUAL PAGE XIV VERSION 0 3 2021 01 14...
Страница 22: ...VX150 TO VX2 INSTALLATION MANUAL PAGE XXII VERSION 0 3 2021 01 14...
Страница 26: ...VX150 TO VX2 INSTALLATION MANUAL DESCRIPTION PAGE 1 1 4 VERSION 0 3 2021 01 14...
Страница 36: ...VX150 TO VX2 INSTALLATION MANUAL ELECTRICAL REQUIREMENTS PAGE 1 5 4 VERSION 0 3 2021 01 14...
Страница 38: ...VX150 TO VX2 INSTALLATION MANUAL RF OUTPUT REQUIREMENTS PAGE 1 6 2 VERSION 0 3 2021 01 14...
Страница 42: ...VX150 TO VX2 INSTALLATION MANUAL PROGRAM INPUTS PAGE 1 7 4 VERSION 0 3 2021 01 14...
Страница 44: ......
Страница 54: ...VX150 TO VX2 INSTALLATION MANUAL CONTROL AND MONITOR WIRING PAGE 1 8 10 VERSION 0 3 2021 01 14...
Страница 64: ...VX150 TO VX2 INSTALLATION MANUAL COMPLETING EXTERNAL CONNECTIONS PAGE 1 10 8 VERSION 0 3 2021 01 14...
Страница 74: ...VX150 TO VX2 INSTALLATION MANUAL PARTS AND TOOLS PAGE 1 12 4 VERSION 0 3 2021 01 14...
Страница 84: ...VX LP INSTALLATION MANUAL LIST OF TERMS PAGE 1 14 2 VERSION 0 3 2021 01 14...
Страница 85: ......