Performance Checks

Any valves or devices controlling the flow of water through a compound meter must always be opened and closed SLOWLY to 

prevent shock loads that may damage the meter’s rotor assembly 
Complete the following checks to ensure that a compound meter is properly installed and operational:
•  Slowly open the upstream valve to apply water pressure to the meter and check to see if there are any leaks  Tighten the 

flange bolts as required 

•  Perform a functional test of the meter  Slowly open valve on downstream side of the meter to evacuate any air that may 

have been trapped in the service line  When air has been eliminated, increase demand flow rate by further opening the 

downstream valve or valves  Observe the register for correct direction of flow  Continue to open the demand side valves 

to a flow rate sufficient to open the valve assembly in the meter—a procedure which will start water flowing through the 

turbo high-side rotor  The high flow pointer will now move in the proper direction  Now open all applicable service valves 

•  Check the flow rate to verify that the flow does not exceed the maximum continuous duty specification  The rate of flow 

can be quickly checked by timing the quantity registered through the meter in one minute 

Reading the Recordall Registers (and Encoder)

To determine the total reading for meter, the totals for both low and high flow must be added together  

1   Determine the low flow total by reading the register/encoder identified as low flow  Read only the moveable 

number wheels 

2   From the high flow register, read both the number wheels and the sweep hand  Read the number wheels first  Read 

only the moveable number wheels  Note the position of the sweep hand, round the number down to the nearest 

increment  Add the reading from the number wheel and the sweep hand together 

3   To determine the complete total flow, add the low flow and high flow totals together 

0

1

4

5

6

7

8

9

2

3

Badger Meter

®

Gallons

64063-017

2"/3"

Low Flow

Total Flow=High + Low

®

Recordall

Compound 

Low Flow

0

10

40

50

60

70

80

90

20

30

Badger Meter

®

Gallons

High Flow

64063-002

®

3"

Recordall

Compound 

400

High Flow

Figure 7:  Reading the register example

Installation

June 2016

RCS-UM-00076-EN-04

Page 9 

Содержание T200

Страница 1: ...Size High Side Model Placed on Short side of meter Low Side Model Placed on Taller side of meter 2 T200 M25 or also labeled Low 2 3 3 M450 M25 or also labeled Low 2 3 4 M1000 M35 or also labeled Low 4...

Страница 2: ...ector endpoint side with the corresponding projection on the other encoder side and push the ends together for the correct fit See 308 In line connector Figure 2 With Nicor in line connectors hold the...

Страница 3: ...nut onto the tube threads as shown 2 Insert the endpoint tube through the bottom of the lid 3 Screw the top cap onto the endpoint tube threads as shown and tighten 4 Tighten the lock nut against the b...

Страница 4: ...ND PRIOR TO ATTACHING THE ENDPOINT TO AVOID DAMAGE 2 Once in the ground secure the mounting bracket on the appropriate rebar or pipe using the enclosed washer wing nut and hex head bolt provided with...

Страница 5: ...RCS UM 00076 EN 04 June 2016 Recordall Compound Series Meter Lead Free Bronze Alloy Sizes 2 3 4 6 NSF ANSI Standards 61 and 372 Certified User Manual...

Страница 6: ...Page ii Recordall Compound Series Meter Lead Free Bronze Alloy Sizes 2 3 4 6 June 2016 RCS UM 00076 EN 04...

Страница 7: ...nd Assemblies 12 Removing the High Flow Turbo Meter Head Assembly 12 Removing the Turbo Measuring Element Assembly from the Cover Plate 14 Removing the Magnet Carrier Top Gear Set 14 Removing the Stra...

Страница 8: ...Page iv Recordall Compound Series Meter Lead Free Bronze Alloy Sizes 2 3 4 6 June 2016 RCS UM 00076 EN 04...

Страница 9: ...rs Product Data Sheet contains information on operating principle meter construction materials tolerances and specifications The Recordall Compound Series Meters Parts List contains part numbers part...

Страница 10: ...s in pipe direction or valving resulting in more accurate registration Contact your Badger Meter representative for information on Recordall Plate Strainers Avoid locating the meter in close quarters...

Страница 11: ...equal in size to the meter is required upstream of the meter Additional length is required if a sharp contraction or an eccentric reducer rather than a concentric tapered reducer is used Installing t...

Страница 12: ...er Figure 4 2 adapter with a 2 round meter Figure 5 4 adapter Figure 6 4 with a 4 meter Description Part Number 2 Elliptical Flange Adapter Kit 64186 001 2 Round Flange Adapter Kit 64186 002 4 Flange...

Страница 13: ...n Now open all applicable service valves Check the flow rate to verify that the flow does not exceed the maximum continuous duty specification The rate of flow can be quickly checked by timing the qua...

Страница 14: ...e added together to determine the total flow through the meter Compare this to that recorded by the test meter or test tank If more than one revolution of the high flow test circle occurs take new rea...

Страница 15: ...aning Clean all dirt grease moisture or other foreign material from the exterior of the meter After cleaning rinse thoroughly with water In the event that system pressure has been reduced and the upst...

Страница 16: ...DO SO CAN LEAD TO THE HEAD BEING EJECTED FROM HOUSING CAUSING PERSONAL INJURY AND OR PROPERTY DAMAGE 1 Loosen each of the High Flow Turbo Head Assembly bolts about 1 1 2 turns Do not completely remov...

Страница 17: ...bottom bearing Calibration ring rear Rotor Calibration ring front Nose cone setscrew Cage setscrew 1 Cage seal Nose cone straightening vane assembly 2 Calibration shaft seal plug Calibration shaft lo...

Страница 18: ...in access to them remove the measuring element from the cover Removing the upstream nose cone provides access to the rotor calibration ring and the transmission assembly To remove the nose cone 1 Unsc...

Страница 19: ...NG 6 Figure 11 Calibration ring linkage assemblies Reassembling the Calibration Mechanism 1 Align the pin on the perimeter of the calibration ring with the arrow tip located on the nose cone assembly...

Страница 20: ...ng pins are an integral part of the straightening vane and nose cone assembly Wear or damage would require the replacement of this component Reassembling the Rotor and Bearings 1 Install the rear nose...

Страница 21: ...and out of the bottom bearing then slide shaft downward and diagonally out towards you to remove it from the nose cone cage assembly 7 Holding cage firmly with one hand rotate the nose cone clockwise...

Страница 22: ...the Low Flow Cover Assembly bolts about 1 1 2 turns Do not completely remove the bolts 2 If the O ring between the Low Flow Cover Assembly and the housing is secure and not leaking pry the Measuring...

Страница 23: ...magnet in the meter head is clean Valve Assembly Removing the Valve Assembly With the cover assembly removed the valve assembly is exposed for service 1 Remove the lock pawl see Figure 14 2 Turn the v...

Страница 24: ...stic Rotor Thrust Bearing Sapphire jewels Rotor Bearing Pivots Passivated 316 stainless steel Calibration Mechanism Stainless steel thermoplastic Measuring Chamber Disc Thermoplastic High Flow Valve S...

Отзывы: