APPENDIX F. VIDEO TUTORIAL LINKS
151
•
– Coin Caliper II demo Step 5/15: Connect the
Vision Assistant Express VI controls and indicators to the data highway.
•
– Coin Caliper II demo Step 6/15: Use a “Property
Node” to obtain the user-selected ROI from the main image display.
•
– Coin Caliper II demo Step 7/15: Create an
action button for the “calibrate” state.
•
Step 8: Create Increment State
– Coin Caliper II demo Step 8/15: Create
the “increment file number” state and add “file number” to the data
highway.
•
Step 9: Create Calibrate State
– Coin Caliper II demo Step 9/15: Create
the “calibrate” state, add “known diameter” to the data highway, and
calculate the scale factor as known diameter [mm] divided by measured
diameter in pixels.
•
– Coin Caliper II demo Step 10/15: Edit
the “(image) overlay” state to add the measured coin diameter to the
nondestructive overlay.
•
Step 11: Edit Save Image State
– Coin Caliper II demo Step 11/15: Edit
the “save image” state to obtain the base image name from a front-panel
control and the “file number” from the data highway.
•
Step 12: Edit myRIO Ports State
– Coin Caliper II demo Step 12/15: Edit
the “(myRIO) update ports” state to operate the myRIO LED indicators.
•
– Coin Caliper II demo Step 13/15: Edit
the “(qsm) schedule” state to create the necessary tasks.
•
– Coin Caliper II demo Step 14/15: Set up the
camera mode (resolution) and attributes.
•
– Coin Caliper II demo Step 15/15: Run and
debug the application until it works properly.
52
(3:53)
53
(1:32)
54
(1:07)
55
(2:45)
56
(2:43)
57
(2:19)
58
(4:40)
59
(2:42)
60
(2:17)
61
(2:54)
62
(8:19)
Содержание NI myRIO
Страница 1: ...Ed Doering NI myRIO Vision Essentials Guide...
Страница 2: ......
Страница 11: ...Part I Machine Vision Fundamentals...
Страница 12: ......
Страница 31: ...Part II Introductory Machine Vision Projects...
Страница 32: ......
Страница 38: ...32 CHAPTER 4 CAMERA SETUP...
Страница 44: ...38 CHAPTER 5 STEREO VISION...
Страница 61: ...Part III Machine Vision Application Projects...
Страница 62: ......
Страница 72: ...66 CHAPTER 8 COIN COUNTER...
Страница 85: ...CHAPTER 10 KEYED OPTICAL LOCK 79 Figure 10 3 Typical expected results for the Geometric Matching step...
Страница 86: ...80 CHAPTER 10 KEYED OPTICAL LOCK...
Страница 92: ...86 CHAPTER 11 DMM TEST STAND...
Страница 134: ...128 CHAPTER 17 MARBLE SORTER...
Страница 135: ...Part IV Appendices...
Страница 136: ......
Страница 143: ...B MXPandMSPConnectorDiagrams Figure B 1 MXP myRIO eXpansion Port connector diagram...
Страница 144: ...138 APPENDIX B MXP AND MSP CONNECTOR DIAGRAMS Figure B 2 MSP miniSystem Port connector diagram...
Страница 148: ...142 APPENDIX D BUILD A STAND ALONE APPLICATION...
Страница 149: ...E MarbleSorterConstructionDetails To be continued...
Страница 150: ...144 APPENDIX E MARBLE SORTER CONSTRUCTION DETAILS...