background image

Test Conditions

The following setup and environmental conditions are required to ensure the device meets

published specifications.

Keep connections to the device as short as possible. Long cables and wires act as

antennas, picking up extra noise that can affect measurements.

Verify that all connections to the device are secure.

Use shielded copper wire for all cable connections to the device. Use twisted-pairs wire

to eliminate noise and thermal offsets.

Maintain an ambient temperature of 23 °C ± 5 °C.

Keep relative humidity below 80%.

Allow a warm-up time of at least 10 minutes to ensure that the device measurement

circuitry is at a stable operating temperature.

Initial Setup

Complete the following steps to set up the NI 9252.
1. Install NI-DAQmx.
2. Make sure that the NI cDAQ-9178 power source is not connected to the chassis.
3. Connect the NI cDAQ-9178 chassis to the system safety ground.

a) Attach a ring lug to a 14 AWG (1.6 mm) wire.
b) Connect the ring lug to the ground terminal on the side of the NI cDAQ-9178 using

the ground screw.

c) Attach the other end of the wire to the system safety ground.

4. Install the module in slot 8 of the NI cDAQ-9178 chassis. Leave slots 1 through 7 of the

NI cDAQ-9178 chassis empty.

5. Connect the NI cDAQ-9178 chassis to your host computer.
6. Connect the power source to the NI cDAQ-9178 chassis.
7. Launch Measurement & Automation Explorer (MAX).
8. Right-click the device name and select 

Self-Test

 to ensure that the module is working

properly.

Verification

The following performance verification procedure describes the sequence of operation and

provides test points required to verify the NI 9252. The verification procedure assumes that

adequate traceable uncertainties are available for the calibration references.

Accuracy Verification

Complete the following procedure to determine the As-Found status of the NI 9252.

NI 9252 Calibration Procedure

  | 

© National Instruments

  | 

3

Содержание NI-9252

Страница 1: ...NI 9252...

Страница 2: ...ication 6 Accuracy under Calibration Conditions 6 Worldwide Support and Services 7 Software Calibrating the NI 9252 requires the installation of NI DAQmx 19 1 or later on the calibration system You ca...

Страница 3: ...rt for Visual Studio Reference information for NI DAQmx NET methods and NI DAQmx NET properties key concepts and a C enum to NET enum mapping table Test Equipment The following table lists the equipme...

Страница 4: ...8 chassis to the system safety ground a Attach a ring lug to a 14 AWG 1 6 mm wire b Connect the ring lug to the ground terminal on the side of the NI cDAQ 9178 using the ground screw c Attach the othe...

Страница 5: ...ble 2 NI 9252 AI Voltage Task Physical Channels Range Terminal Configuration cDAQMod8 AI0 7 10 5 V Differential b Configure the AI voltage channel timing according to the following NI 9252 Task Timing...

Страница 6: ...equired to adjust the NI 9252 Accuracy Adjustment Complete the following procedure to adjust the accuracy performance of the NI 9252 1 Set the calibrator to Standby mode STBY 2 Connect the NI 9252 to...

Страница 7: ...calibration temperature without making any adjustments by initializing an external calibration setting the C Series calibration temperature and closing the external calibration Reverification Repeat...

Страница 8: ...i com services for information about the services NI offers Visit ni com register to register your NI product Product registration facilitates technical support and ensures that you receive important...

Страница 9: ...ents EULAs and third party legal notices in the readme file for your NI product Refer to the Export Compliance Information at ni com legal export compliance for the NI global trade compliance policy a...

Отзывы: