background image

Verification

The following performance verification procedure describes the sequence of operation and

provides test points required to verify the NI 9231. The verification procedure assumes that

adequate traceable uncertainties are available for the calibration references.

Accuracy Verification

Complete the following procedure to determine the As-Found status of the NI 9231.
1. Set the calibrator to Standby mode (STBY).
2. Connect channel 0 of the NI 9231 to the calibrator as shown in the following figure.

Figure 1.

 Analog Input Verification Connections

NI 9231

+

HI

LO

Calibrator

AI

x

Note

 

The chassis ground lug connection to ground is the NI 9231 ground

connection.

3. Set the calibrator voltage to a Test Point value indicated in the 

NI 9231 Verification Test

Limits

 table.

4. Set the calibrator to Operate mode (OPR).
5. Acquire and average samples for each channel.

a) Create and configure an AI voltage task according to the following 

NI 9231 AI

Voltage Task Configuration

 table.

Table 2.

 NI 9231 AI Voltage Task Configuration

Minimum (V) Maximum (V) Scaled Units Physical Channels Channel Configuration

 

 

 

 

 

-5

5

Volts

AI

x

DC Coupled

b) Configure the task timing according to the following 

NI 9231 Timing Configuration

table.

Table 3.

 NI 9231 Timing Configuration

Sample Mode

Samples Per Channel

Rate (kS/s)

 

 

 

Finite Samples

5120

51.2

c) Start the task.
d) Read the samples from the NI 9231.
e) Average the samples for each AI channel.
f) Clear the task.

4

  | 

ni.com

  | 

NI 9231 Calibration Procedure

Содержание NI 9231

Страница 1: ...NI 9231...

Страница 2: ...Update 6 Reverification 6 Accuracy under Calibration Conditions 6 Worldwide Support and Services 7 Software Calibrating the NI 9231 requires the installation of NI DAQmx 18 1 or later on the calibrat...

Страница 3: ...AQmx NET Help Support for Visual Studio Reference information for NI DAQmx NET methods and NI DAQmx NET properties key concepts and a C enum to NET enum mapping table Test Equipment The following tabl...

Страница 4: ...ement circuitry is at a stable operating temperature Initial Setup Complete the following steps to set up the NI 9231 1 Install NI DAQmx 2 Make sure that the NI cDAQ 9178 power source is not connected...

Страница 5: ...s the NI 9231 ground connection 3 Set the calibrator voltage to a Test Point value indicated in the NI 9231 Verification Test Limits table 4 Set the calibrator to Operate mode OPR 5 Acquire and averag...

Страница 6: ...stment The following performance adjustment procedure describes the sequence of operation required to adjust the NI 9231 Accuracy Adjustment Complete the following procedure to adjust the accuracy per...

Страница 7: ...an external calibration setting the C Series calibration temperature and closing the external calibration Reverification Repeat the Verification section to determine the As Left status of the device...

Страница 8: ...t ni com services for information about the services NI offers Visit ni com register to register your NI product Product registration facilitates technical support and ensures that you receive importa...

Страница 9: ...ments EULAs and third party legal notices in the readme file for your NI product Refer to the Export Compliance Information at ni com legal export compliance for the NI global trade compliance policy...

Отзывы: