background image

www.nassarelectronics.com

4

EN-3P LIQUID LEVEL CONTROL RELAY

Testing the EN-3P

If the EN-3P is not operating correctly please follow the next 
steps to verify if the installation is correct:

1.-

  Connect the 120 VCA voltage supply to terminals T1 and 

T2, the green LINE LED should turn ON. Use a wire to 
connect terminal F/D with terminal PC.

120VCA

NO

C

NC

PL

PH

T1

F/D

T3

PC

T2

RELAY

LINE

L

H

SENSITIVITY

75K

100K

5K

50K

25K

NO

C

NC

PL

PH

T1

F/D

T3

PC

T2

RELAY

LINE

L

H

SENSITIVITY

75K

100K

5K

50K

25K

NO

C

NC

PL

PH

T1

F/D

T3

PC

T2

RELAY

LINE

L

H

SENSITIVITY

75K

100K

5K

50K

25K

If the EN-3P operated correctly when following this steps, 
but continues experiencing problems with the operation it 
indicates that  the problem is not the EN-3P. The problem 
comes from the installation or an issue with the wiring, 
common issues with the installation or wiring include:

A.- 

A bad connection with the cables.

B.-

 A bad connection with the probes.

C.-

 The liquid resistance is too high (above 100K ohms).

3.-

 Connect terminals F/D, P/C and PL with terminal PH. The 

H (High Probe) LED and the red RELAY LED should turn ON 
and the output contact between NO and C should be closed. 
Use a multimeter to measure the continuity between NO 
and C to make sure the contact is closed.

2.-

 Connect terminals F/D and P/C with terminal PL, the L 

(Low Probe) LED should turn ON.

120VCA

120VCA

Dimensions

in (mm)

1.77(45)

3

(77)

4.44(113)

4.68 (119)

Содержание EN-3P

Страница 1: ...SINCE 1973 www nassarelectronics com The best solutions for automation and protection User Manual LIQUID LEVEL CONTROL RELAY MODEL EN 3P ...

Страница 2: ...OWN DRAIN APPLICATION The relay energizes when the liquid level comes in contact with the high probe PH and remains energized until the liquid level falls below the lower probe PL To use this application place a wire betweenterminalsF DandPC F D PC PUMPUP FILL APPLICATION The relay energizes when the liquid level falls below the low probe PL and remains energized until the liquidlevelcomesincontac...

Страница 3: ... M Contactor Overload Relay OL SW Switch CB Circuit Breaker 1 Use cable size 12 to 18 AWG to wire the probes 2 Use 3 different cable colors to prevent a mixup with the probes 3 The probe PC should not be more than 8 inches below from probe PL 4 The probe PH should not be more than 48 feet higher than probe PL Probe installation PC PL PH PROBE CABLES PROBE CABLE BRONCE PROBE TIGHTENING SCREW HIGH P...

Страница 4: ...ted correctly when following this steps but continues experiencing problems with the operation it indicates that the problem is not the EN 3P The problem comes from the installation or an issue with the wiring common issues with the installation or wiring include A A bad connection with the cables B A bad connection with the probes C The liquid resistance is too high above 100K ohms 3 Connect term...

Страница 5: ...CTION WHETHER BASED IN CONTRACT INFRINGEMENT NEGLIGENCE STRICT LIABILITY OTHER TORT OR OTHERWISE SHALL NASSAR ELECTRONIC S LIABILITY TO THE BUYER AND OR ITS CUSTOMERS EXCEED THE PRICE TO THE BUYER OF THE SPECIFIC GOODS MANUFACTURED OR SERVICES PROVIDED BY NASSAR ELECTRONICS GIVING RISE TO THE CLAIM OR CAUSE OF ACTION THE BUYER AGREES THAT IN NO EVENT SHALL NASSAR ELECTRONIC S LIABILITY TO THE BUYE...

Отзывы: