background image

Ensure that all loads and generators are switched off
Disconnect the NEGATIVE terminal from the battery and
connect it to the shunt as shown in Figure 1.
Connect the Black and White wires and Yellow wire 
to the shunt as shown on Figure 1.
Connect the short link cable to the shunt and then to the 
negative terminal of the battery, as shown on Figure 1. 
Ensure it is positioned where it cannot come into electrical 
contact with other parts, and ensure it will remain dry and 
free from contaminants. Also note that the shunt can get 
warm when heavy currents flow, so ensure it is secured in 
a position where its heat cannot affect other parts. 
TAKE CARE TO AVOID OVER-TIGHTENING THE 
CONNECTIONS TO THE SHUNT..
Finally, connect the red wire to the POSITIVE terminal of the 
battery to complete the electrical installation. The BM-1 Compact
 will now begin assessing the battery state, using its factory 
default values. The default values must be set to the values 
appropriate to the new installation as discussed in 
SETTING UP, below.
Do NOT put the battery on charge immediately.
Apply a load to the battery by switching on lights or instruments 
and wait for a few minutes for the BM-1 Compact to “learn” 
the battery's characteristics and to show a steady reading 
before starting charging.
It is necessary to set the battery capacity to the correct value, 
and may be necessary to calibrate the zero current setting, 
as described in SETTING UP, below.

6.
7.

8.

9.

10.

11.
12.

13.

NORMAL OPERATION

The BM-1 

Compact

 offers two normal modes of operation:

       

Time to go.

       

Volts and Amps;

The battery charge state is always displayed on the scale on the right 
of the display. If the battery voltage falls below the preset alarm level 
representing dangerous discharge, the alarm bell symbol is flashed.

5

Содержание BM-1 Compact

Страница 1: ...BATTERY MONITOR BM 1 Compact NASA BM 1 Compact V A TIME 100 h 80 60 40 TIME TO DISCHARGE hours DESIGNED AND MANUFACTURED IN ENGLAND RoHS 2002 95 EC ...

Страница 2: ...T INSTALLATION OF THE DISPLAY UNIT NORMAL OPERATION SWITCHING THE BACKLIGHT SHOWING THE TIME TO GO SHOWING THE VOLTAGE AND CURRENT SETTING UP SETTING THE BATTERY CAPACITY SETTING THE ZERO CURRENT BATTERY MANAGEMENT BASICS QUESTIONS AND ANSWERS 2 2 2 2 2 5 6 6 7 7 8 8 9 11 1 ...

Страница 3: ... to full discharge during discharging A visual indication of the state of the battery charge is always available and an alarm is used as an alert when the battery voltage falls to a preset level INSTALLING THE DISPLAY Safety notes IMPORTANT Lead acid batteries can emit hydrogen when in operation Hydrogen and air forms a potentially explosive mixture Accordingly ensure that the area around the batt...

Страница 4: ...inst the panel face Screw the unit to the panel and connect the wires to the terminal block provided Connect the shunt cable to the display unit as shown on Figure 1 above using the terminal block supplied Be careful to connect the wires exactly as shown noting that the black and white wires are joined at the shunt connection and are connected separately at the instrument end of the cable It is go...

Страница 5: ...ACK WHITE WHITE Cables supplied Original cables WHITE YELLOW YELLOW YELLOW BATTERY SHUNT FUSE Black White MUS T NO T be joine d a t thi s end C a b l e S u p p l i e d BM 1 Compact V A TIME Figure 1 Wiring Installation 5 4 TO LOADS AND CHARGERS ...

Страница 6: ...ete the electrical installation The BM 1 Compact will now begin assessing the battery state using its factory default values The default values must be set to the values appropriate to the new installation as discussed in SETTING UP below Do NOT put the battery on charge immediately Apply a load to the battery by switching on lights or instruments and wait for a few minutes for the BM 1 Compact to...

Страница 7: ...age Time to Go Figure 2 shows the display when the TIME key is pressed The remaining battery capacity in digits as a percentage and analogue thermometer displays and the up to date estimate of how long it will take to charge or discharge the battery fully are shown If the current changes the estimate of the time updates continuously reflecting the best estimate of time to be fully charged or fully...

Страница 8: ...e estimate of capacity may become unreliable It is important to switch some load onto the battery for a few minutes so a reliable estimate can be calculated and its value settles before starting charging SETTING UP Setting up can be done after applying power to the unit while one of the keys is pressed This procedure prevents inadvertent changes being made by an unfamiliar user Applying power is u...

Страница 9: ...ENT If no current is flowing into or out of the battery and yet a small residual current is shown on the display the reading can be adjusted to zero Ensure that no current is flowing into or out of the battery Turn off the unit With the TIME key pressed re apply the power Release the key SET A is briefly displayed to show that the zero current is to be changed The TIME key increases the setting an...

Страница 10: ... battery is 5 Amps because 100 20 5 Likewise a 40 Ah battery would have a 20 hour rate of 2 Amps because 40 20 2 If higher currents than the 20 hour rate are drawn from the battery the available capacity is reduced For example if it is steadily discharged at 10 times the 20 hour rate 50 Amps from a 100Ah battery the available capacity falls to about half of the stated capacity The battery will be ...

Страница 11: ... The BM 1 Compact has an alarm which flashes the bell symbol when the voltage falls below 10 7 Volts If the alarm is triggered it is important to reduce the current being drawn immediately and if possible place the battery on charge to avoid permanent damage to the cells If the alarm is ignored the total number of charge discharge cycles which the battery will survive before it loses a substantial...

Страница 12: ...hrough the shunt Can the BM 1 Compact monitor my engine starting battery as well as my service battery No it cannot The service battery is in continuous use and so needs continuous monitoring The starter battery however is subject only to periodic heavy loads followed by float charging and so does not need to be monitored I have another voltmeter on my vehicle which shows a different value to the ...

Страница 13: ...city it may need replacement or you may feel that changing the nominal capacity from the Engineering mode will suffice to let you know well enough the percentage charge remaining When on heavy load the time to run is lower than I expect Is this correct YES When heavily loaded a lead acid battery delivers less energy than expected owing to electrolyte exhaustion and stagnation When the battery is d...

Страница 14: ... prudently and check its operation from time to time against other data Inspect the installation from time to time and seek advice if any part thereof is not fully seaworthy Nasa Marine Ltd warrants this instrument to be substantially free of defects in both materials and workmanship for a period of one year from the date of purchase Nasa Marine Ltd will at its discretion repair or replace any com...

Отзывы: