Installation instructions for qualified personnel
P. 14/20
5.2. Final testing
1.
Check to ensure that all cables are connected correctly.
2.
Remove the power plug.
3.
Connect the power plug back to the power supply, the LED (see Fig. 6,
Pos. 3) will light up for approximately 1 second.
The following tests must be performed by an electrician.
WARNING
The following tests are performed with the control unit switched on;
there is a risk of electric shock.