.Power on for battery module

When installation is accomplished, battery module is in dormant state. 

Take on of the Key Switch,

battery will go into normal running status, and discharge/charge

 

can be available.

Parameter settings for lithium battery modules in power plant are shown in Table 3-1.

After the battery is turned on, you need to pull out the key and close the key switch protective
cover to ensure that the IP protection level of the battery is IP65, and keep the key properly to
avoid the loss of the key and the battery cannot be turned off and on.

5.RS485 communication connection

Connect the battery to the device/PC through the communication cable provided by Narada. The

cable has an anti-misconnection setting.

If there is only one battery module in operation, communication between battery module and

computer can available through RS485.

If there are more than one battery modules in operation, parallel communication can be available

using RS485.

Communication protocols for RS485 are shown in Annex 3.

6.Discharge with dummy load

Dummy load cannot be larger maximum discharge current of 

FEN4850 battery

 according to the

datasheet, and BLVD is larger than 43.2V.

Voltage drop on cable between battery module and power plant shall be less than 0.5V . Method

of

 

calculation for cross sectional area of cable is shown as below.

A=ΣI×L/(K×

U)

In the above formula, A is across sectional area of wire (mm2), ΣI is the total current (A), L is length 

of cable, 

U is the permit voltage drop on cable (V), and K is electrical conductivity of wire. For 

example, for copper, K = 57.

6

.Battery output connection

Connect the battery and the device busbar through the power cable provided by Narada, and the
cable has an anti-misconnection setting.

The red of the power cable is the positive, and the black is the negative.(See Annex 3)

If multi battery modules will be connected in parallel, please take note of follows:

1)

The battery modules connected no more than 8 in parallel.

2)

Connect ‘+’  of battery output of each battery module with positive copper bar of power
plant,                and ‘-’ with negative copper bar of power plant or power switch separately.

3)

Length of cable between battery module and power plant shall be less than 2.0m. To make
sure similar voltage drop of cable for each battery, length of all positive and negative cables
should be the same.

4

.Ground connection

Connect earth by flexible cable above GREEN Sheathed, UL94-V0, gauge of the grounding wire
should  be  equal  to  or  greater  than  the  gauge  of  the  battery  return  wire,  .no  less  than  6AWG,

The FEN4850 battery has 2 grounding bolts (M6).

Содержание FEN4850

Страница 1: ...LITHIUM IRON PHOSPHATE BATTERY NARADA POWER SOURCE CO LTD Email intl narada biz Website en naradapower com OPERATION MANUAL Version 1 0 FEN4850 Outdoor battery for Telecom 5G...

Страница 2: ...ing principle Technical Characteristic Discharge performance Charge performance Operation Parameter settings Operation condition Storage and Installation Storage Installation Maintenance General Troub...

Страница 3: ...peration Please check if the box is damaged If damaged please immediately notify the supplier If you find leaking liquid or white powder residue on product prohibit operation 03 04 Narada FEN4850 lith...

Страница 4: ...ed Table 1 2 There is one green LED light in front panel indicating running status Detailed information is shown in Annexed Table 1 1 Indicator for alarms Indicator for running status ALM RUN 3 4 comm...

Страница 5: ...ing Chemical power energy storage and power supply components Protect LFP cells against overcharge over discharge over current over temperature short circuit Equalization LFP cells for cells unbalance...

Страница 6: ...MS used for battery modules of FEN4850 battery can comply with the outdoor power plants during operation no interfere with each other BMS can provide protections against overcharge over discharge over...

Страница 7: ...more than 2 in parallel the max charge current recommend 0 5C Operation Condition Table 3 2 Requirements for Operation Environment Temperature Range C Discharge Charge Storage Discharge Charge Storage...

Страница 8: ...destroy with appearance contact with the supplier as soon as possible This device shall be installed and operated by professionals Preparation for Installation Batteries shall not be placed close to...

Страница 9: ...age drop on cable between battery module and power plant shall be less than 0 5V Method of calculation for cross sectional area of cable is shown as below A I L K U In the above formula A is across se...

Страница 10: ...rtant load and charge battery Shutdown system and call maintenance service Do not need to solve Do not need to solve Regulate cell temperature in the range of 0 C to 55 C for charge Shutdown system an...

Страница 11: ...te but neither charge nor discharge Charging state Discharging state Dormant state Minor Alarm Various Alarm Status Fail Various fail Major Alarm Various protection status Normal no alarm Annex 2 Inst...

Страница 12: ...B C C D D Red White Yellow Black A B C D Positive Negative Negative Positive Red Black Black Red Annex 4 Introduction of WIFI FEN4850 battery has WIFI function you can connect the battery through mobi...

Страница 13: ...kit Road 1 02 10 Eunos Technolink Singapore 415938 Tel 65 6848 1191 Fax 65 6749 3498 Website www narada ap com Email sales narada ap com Spectrum House Dunstable Road Redbourn St Albans Herts Al3 7PR...

Отзывы: