
W415-1793 / A / 05.07.18
EN
14
venting requirements
2.3 all terminations
0’
0’
Base of
air collar
10’
10’
15’
15’
20’
25’
20’
30’
40’
5’
1 1/2’
(18”)
1 1/4’ min.
(15 1/8”)
5’
1 elbow zone
1-2 elbow zone
1-3 elbow zone
1-4 elbow zone
1-5 elbow zone
1-6 elbow zone
H
V
V+H ≤ 40 ft. (For longer vent runs, a power
vent is required).
H ≤ 20 ft.
V + H are measured from the centre of vent
elbows. Elbows are considered as 90º.
Two 45º elbows = One 90º elbow.
3’ min.
(36”)
38 1/2’
(462”)
Vertical termination only.
No horizontal termination allowed.
Содержание Ascent X 70 Series
Страница 107: ...W415 1793 A 05 07 18 107 notes FR 16 0 notes 29 1...