W415-3036 / B / 08.19.22
EN
4
table of contents
1.0
general information
5
1.1
rates and efficiencies
5
1.2
installation checklist
6
1.3
installation overview
7
1.4
rating plate information
9
1.5
mobile home installation
9
1.6
hardware list
10
2.0 dimensions
11
2.1
optional heat management system 12
3.0 venting requirements
13
3.1
typical venting installation
14
3.2
minimum air terminal location
clearances
18
3.3
vent application flow chart
19
3.4 definitions
19
3.5
elbow vent length values
19
3.6
horizontal termination
20
3.7
vertical termination
22
3.8
vent shield installation
24
4.0 rough framing
25
4.1
minimum framing dimensions
26
5.0 venting installation
28
5.1
horizontal installation
29
5.2
vertical installation
30
5.3
using either flexible or rigid vent
components
31
5.4
using flexible vent components
31
5.4.1 horizontal air terminal installation
31
5.4.2 vertical air terminal installation
32
5.4.3 appliance vent connection
32
5.5
using rigid vent components
33
5.5.1 horizontal air terminal installation
33
5.5.2 vertical air terminal installation
34
5.5.3
restricting vertical vents
35
6.0 electrical information
36
6.1
hard wiring connection
36
6.2
receptacle wiring diagram
36
6.3
electronic wiring diagram
36
6.4
optional wall switch
36
6.5
battery back-up installation
37
6.6
wiring diagram
38
7.0 gas installation
39
8.0 operation
40
8.1
pilot on demand
41
9.0 finish framing
42
9.1
nailing tab installation
42
Changes, other than editorial, are denoted by a vertical line in the margin
note:
9.2
flush
43
9.3 recessed
44
9.4
minimum clearance to combustible
enclosures
45
9.5
alcove enclosure
45
10.0 finishing
46
10.1 control cover installation
46
10.2 installing non-combustible board 47
10.3 minimum combustible mantel
clearances
48
10.4 clearances around appliance (TV and
valuable objects)
49
10.5 safety barrier & glass door installation
/ removal
50
10.6 glass media installation
51
10.7 optional blower installation
52
10.8 restricting vertical vents
53
10.9 venturi adjustment
53
10.10 pilot burner adjustment
54
10.11 flame characteristics
54
11.0 maintenance
55
11.1 care of glass
55
11.2 annual maintenance
56
11.3 glass / door replacement
56
12.0 replacement parts
57
12.1 overview
58
12.2 valve train assembly
59
13.0 troubleshooting
60
14.0 warranty
63
15.0 service history
64
Содержание Ascent Linear BL56
Страница 65: ...EN W415 3036 B 08 19 22 65 service history...
Страница 131: ...W415 3036 B 08 19 22 131 garantie FR...