napcopipe.com
11
Main line size
Spline length
Approximate length
of spline extending out
6"
24"
1"
8"
32"
2 ¼"
10"
Two ½ Splines 20" each
1 ½"
12"
Two ½ Splines 24" each
2 ¼"
Spline hole(s)
Insert pointed end of
spline first
Push spline into the
spline hole
Push spline into the
spline hole
Push spline into the
spline hole
Splines fully inserted
Notes:
If digging bars are used for leverage, protect the pipe with at minimum, a 2" x 4" block in good condition.
Never “hammer” on pipe that does not seat. Check alignment, then apply pressure with a digging bar again. In difficult situations where pipe is
properly lubricated and aligned, use one digging bar to maintain pressure and a second bar to apply additional pressure.
In most cases, when pipe is properly seated, you will feel/hear a slight pop. If the spline will not easily insert into the hole, then the pipe has not
been seated properly.
Bar and block
Bar and block
Strap
Backhoe with a strap
7. Insert each spline(s) into the spline hole until there is a “tail” of the specified dimension below.
8. Repeat as necessary.
Содержание Certa-Set
Страница 1: ...Certa Set Field Installation Guide ...