Installation Guide Modbus E5000 IAQ probe 

 

page 6/6 

6.  Power on 

Few seconds after power-up, all LEDs will be activated individually for a visual test. At the end of the 
cycle, failure message made of blink between orange and red LED may appear during few seconds, the 
time to interrogate all sensors then, the blue LED shall "breathes" if the air quality is good enough. The 
start-up cycle includes built in tests and visual checks of LEDs 
The cycle lasts about 

one minute

 in total. 

 
LEDs indicate faults as follows: 
 

LED code on the front panel 

Identification #  

Defective FRU 

No LED active 

NA 

Power supply failure suspected or 
probe power supply board 

Red LED on for 5 seconds 

 

 

Followed by a yellow flash 

Front panel board.

 

Followed by 2 yellow flashes

 

Single band CO2 sensor module. 

Followed by 3 yellow flashes

 

Dual band CO2 sensor module 

Followed by 4 yellow flashes

 

VOC sensor module 

Followed by 5 yellow flashes

 

Motherboard 

Followed by 6 yellow flashes

 

Interconnection board 

Followed by 7 yellow flashes

 

Particle sensor board 

Followed by 8 yellow flashes

 

Power supply board 

Red LED blinking  

Multiple failures 

Alternation Red Blue 

10 

Perishable sensor reaching the end 
of life. 

All LEDs blinking

 

11 

No communication between front 
panel and probe. (after 30 seconds) 

 

7.  Connections 

7.1. 

Power supply 

 
The power supply must be continuous (DC) and between 12 and 32V (24V nominal). 
 

8.  NFC 

Used for commissioning (See commissioning and App manuals) 
 

9.  Disconnection 

 

 

 

Содержание EP5000M

Страница 1: ...levue 92100 Boulogne Billancourt France Tél 33 0 1 41 41 00 02 www nano sense com page 1 6 EP5000M air quality probe Installation manual Ver Date Modification Update V1 16 12 2019 Initial Version V2 23 04 2021 Update ...

Страница 2: ...tallation Guide Modbus E5000 IAQ probe page 2 6 Summary 1 Security 3 2 Positioning 3 3 Flush mounting 5 4 Wiring 5 5 Installation 5 6 Power on 6 7 Connections 6 7 1 Power supply 6 8 NFC 6 9 Disconnection 6 ...

Страница 3: ...oltages 2 Positioning The position of the probe is crucial vis à vis efficiency and energy savings for ventilation heating and cooling The probe is designed to ensure air quality it must be placed in the area of occupancy of the premise served by outlet vents on a wall at eyes level breathing human level between 1 5 and 1 8m Avoid drafts near openings blowing air doors outlet vents and dead zones ...

Страница 4: ...Installation Guide Modbus E5000 IAQ probe page 4 6 Any work not in accordance with this documentation or changes to the device will invalidate all warranty claims ...

Страница 5: ...ilicone and VOC In case of use of electrical backbox select an airtight case with sealing membrane from which the duct passes through If the case crosses through the sealing plane plasterboard seal between the casing and panel with a special sealant without silicone and VOC Connectors are specified for rigid cable 18 to 24 AWG 1 to 0 5mm dia or twisted 20 to 22 AWG 0 8 to 0 65mm dia The connectors...

Страница 6: ...supply board Red LED on for 5 seconds Followed by a yellow flash 1 Front panel board Followed by 2 yellow flashes 2 Single band CO2 sensor module Followed by 3 yellow flashes 3 Dual band CO2 sensor module Followed by 4 yellow flashes 4 VOC sensor module Followed by 5 yellow flashes 5 Motherboard Followed by 6 yellow flashes 6 Interconnection board Followed by 7 yellow flashes 7 Particle sensor boa...

Отзывы: