Nakayama SP1040 Скачать руководство пользователя страница 7

4

INSTALLATION AND COMMISSIONING

Long enough and strong ropes should be attached to thehandle 

before the first use. When the pump is immersed into the liquid, 

the rope along with a handle can be used to balance the pump.

Installation

The equipment requires an area of at least 60x60cm.

Depth of equipment immersed in technical parameters.

When installing the equipment, make sure the open will not the 

suction opening will not be blocked by foreign objects to keep 

the equipment stable.

Set toggle switch

1.A change-over switch is a device that can be steplesslyadjust-

ed. For this, you first need to loosen the screws. The position 

control height of the switch water can be set by stepless adjust-

ing the length of the power line.

2.Please check the following items before the pump startsrun-

ning:

3.A float switch must be installed so that it is easy to switchbe-

tween the ON and OFF switching points. This should be 

checked, and the floating switch should be carefully picked up 

and put down again. When you do this, pay attention to the 

switching status of the switch.

4.Ensure the distance between the top of the floating switch 

and switch line card buckle is not too small. If the distance is 

too small, it cannot guarantee normal work.

5.When you set up the float switch, make sure that the switch 

does not touch the base before the pump is opened. Warning: 

There is a risk of dry running.

6.Set the switch to automatically control the height of the water 

level by adjusting the position of the float switch cable at the 

card line.

7.Please check the following items before the pump startsrun-

ning:

Содержание SP1040

Страница 1: ...www NakayamaTools com SP1040...

Страница 2: ...www NakayamaTools com RCCB 30m A 16...

Страница 3: ...www NakayamaTools com 350 60 60 cm 1 2 3 4 5 6 1 1...

Страница 4: ...www NakayamaTools com 2 2 1 2 1 2 1 2 1 2 1 2 1 2 350 C SP1040 230 V 50 Hz 1000 W IPX8 40 m 6500 l h 7 m 1 mm...

Страница 5: ...and don t press the power cord 4 The power supply voltage must be the same as the voltage given on the model board 5 To avoid hazards all installation and replacement of compo nents can only be carrie...

Страница 6: ...the main power supply 14 Please contact technical staff 15 Connectors for power plugs and extension cables must be made sure that they are watertight and must not be placed in the water Furthermore co...

Страница 7: ...g the length of the power line 2 Please check the following items before the pump startsrun ning 3 A float switch must be installed so that it is easy to switchbe tween the ON and OFF switching points...

Страница 8: ...ou set up the float switch make sure that the switch does not touch the base before the pump is opened Warning There is a risk of dry running Risk for equipment damage Do not lift the pump by cable or...

Страница 9: ...e pump and dip it into the liquid to be conveyed at a certain angle so that the lower side of the device has no bubble formation to prevent the bubbles from being sucked in Put the equipment down slow...

Страница 10: ...t 2 Clean the pump and replace worn parts Reasons Errorshooting ERROR SHOOTING In most cases you will be able to troubleshoot problems easily by yourself Before you contact us please refer to the foll...

Страница 11: ...le occasions Process equipment Products marked with adjacent symbols shall not be treated as domestic rubbish You must deal with these old electrical and electronic equipment separately Please contact...

Страница 12: ...ubmersion depth Max Grain size Max supply height 1 mm SP1040 230 V 50 Hz 1000 W IPX8 40 m 6500 l h 7 m Attention Risk for equipment damage The particle size mentioned cannot be used for simple gravel...

Отзывы: