Chapter Three
Operation & Use Method of Power
tiller
Ⅰ. Assembly After
Unpacking (see Figure 4)
Figure
4
1. Fix the main machine, insert the hexagonal output shaft into stepped box’s output casing’s
hexagonal hole.
2.Fix the hexagonal stop casing onto the hexagonal output shaft with M6×6 socket head
screws, and make the hexagonal shaft not move axially.
3 .Wheel fixing: fix the wheels at the two sides of the Hexagonal output shaft, and fix them with two M8×55
bolts and M8 nuts.
4. Trailer fixing: Fix the link group onto the trailer, use the link shaft assembly for connection, insert the
split pin
¢
3×26 and insert the velocity adjustment screw into square groove of the link group, and fix it
with M8×55 bolts and nuts.
5. Handle bar fixing: Two gear discs of the handle bar support aim at the discs of the
handle bar support base, and adjust the positions. Fix them with M16×140 bolts, flat gasket 16 and spring
gasket16.
6. Shifting bar assembly: Get the shifting bar through the groove of shift support in the
Содержание MB9005
Страница 1: ...en el WWW NAKAYAMATOOLS COM ART NO 033288 MB9005...
Страница 3: ...1 2 3 4 5 6 7 8 9 10 1 2 3...
Страница 4: ...1 8 55 8 2 16 140 3 1 4 2...
Страница 5: ...3 20W50 SAE30 4 5 r p l I ___ 1 _ r...
Страница 6: ...5 70mmx140mm B 6x125mm 2 6 7 6 1 2 3 4 5 8...
Страница 7: ...9 1 2 3 10 11 12...
Страница 8: ...7 1 1 2...
Страница 9: ...2 1 2 3 80 90...
Страница 10: ...4 SAE20 50 SAE 30 1 1750ml 1 150ml...
Страница 12: ...1 2 25cm 25 40cm 3 4 10km h 5km h 1 2 3 4 5 6 7 8 dry land pc dd 1i eld...
Страница 13: ...5 3 5 4 1 2 150 3 800 4 1500 2000 8 20 3 150 1000 2 2000 0 0 0 0 0 0...
Страница 14: ...0 0 0 0 0 1 2 3 4 5...
Страница 15: ...change auxiliary brick ring o ring o ring o ring o ring o ring...
Страница 16: ......
Страница 41: ......