10
•
The bundles to the lower two splice protection sleeves are first rotated from the middle of
the tray to the other side of the tray, then around the whole tray and finally from the left
side to the splice protection sleeves.
•
Splice the fibers.
5.
The fastening and grounding of the cables
•
After splicing the cables, place the cables in the correct position behind the frame and secure
them with cable ties to the mounting plates on the bracket.
•
Connect the metal parts of the cables to the grounding rail on the rack.
•
Guide the fiber tubes in bundles behind the mounting plates and grounding rail from the
hinge side of the rotating frame.
•
Attach fiber tube bundles behind the mounting plates. Keep in mind the bend radius of the
fibers and the trajectory of the frame when attaching the tubes.
Close the rotating frame.