background image

(Revised 2010-11-15) 

14 

 

“Select/Set” Button 
 

The  Select/Set”  multi-functional  button  on  the  front  panel  of  the 
604/608MFX performs the following actions: 
 

 

Pressing  the  button  briefly  (similar  to  left  mouse  click) 
transitions  the  display  of  the  two  display  mode  LED’s.    The 
current  display  mode  is  indicated  by  the  status  of  the  display 
mode  LED’s  per  the  legend  definition  on  the  front  of  the 
swtich. 

 

 

If  the  Display  Mode  is  currently  selecting  port  status  (all 
Display Mode LEDs off) and if the button is pressed for three 
seconds, the Display Mode LEDs begin to flash.  If  you then 
continue  to  press  the  button  for  a  further  two  seconds,  the 
switch  is  reset.    When  the  600  series  switch  is  reset,  all  the 
settings  return  to  their  defaults  (as  set  in  the  factory).    This 
allows  you  to  cancel  settings  made  from  the  Web  based 
management  tools,  Telnet,  or  the  command  line  configurator 
(serial port), or the fault mask. 

 

 

If the Display Mode is currently selecting the fault status and 
you press the button for two seconds, the display LED’s start 
to flash.  If you then continue pressing the button for another 
two  seconds,  the  current  status  of  the  ports  and  the  supply 
voltage  are  entered  in  the  fault  mask.    Any  change  in  their 
status after the fault mask update will create a fault. 

 

Note

: Do not press the “Select/Set” button while the unit is powering up.  In 

the  event  that  the  “Select/Set”  button  was  pressed  while  the  switch  is 
starting  up  (approximately  a  20-second  window),  all  display  mode  LEDs 
will flash simultaneously.  This mode is exited by pressing the button again 
after the unit has completely powered up (a 20-second delay). 

Содержание 604MFX-ST

Страница 1: ...Revised 2010 11 15 1 600 Series Industrial Ethernet Switches Hardware Installation Guide...

Страница 2: ...Revised 2010 11 15 2 Industrial Ethernet Switch Installation Guide 604MFX ST 604MFXE ST 15 604MFXE ST 40 604MFXE ST 80 608MFX ST 608MFXE ST 15 608MFXE ST 40 608MFXE ST 80...

Страница 3: ...limited to the implied warranties of merchantability or fitness for a particular purpose In no event shall N TRON Corp be liable for any incidental special indirect or consequential damages whatsoeve...

Страница 4: ...he warranty See the grounding technique section of this user manual for proper ways to ground the unit WARNING Do not work on equipment or cables during periods of lightning activity WARNING Do not pe...

Страница 5: ...Optic ports The 604 608MFX are managed switches that supports SNMP management software as well as configuration by a CLI Command Line Interface Serial Port Telnet and or Web based browsers The 600 Ser...

Страница 6: ...ts contain a class 1 laser Do not stare into the laser beam fiber optic connector when installing or operating the product Never install or work on electrical equipment or cabling during periods of li...

Страница 7: ...f this product and who possess the relevant qualifications for their work e g Training in or authorization for connecting up grounding or labeling circuits and devices or systems in accordance with cu...

Страница 8: ...Voltage Current for F1 F2 is limited to 24V 100mA 3 Plug the Voltage Input Plug back into the side header All LED s will flash ON Momentarily 4 Tightening torque for the terminal block power plug is 0...

Страница 9: ...n Likewise the TX out port 8 should be connected to the RX in port 7 of the far end station completing the ring The RX in port 8 should be connected to the TX out port 7 on the far end station 608MFX...

Страница 10: ...separate paths Two of the 608MFX s in a ring are connected together via a connection cable with an ITP cable maximum length of 40m and inform each other of their operating states One of the 608MFX un...

Страница 11: ...1 1 1 Cat5E Cat5E Replacing the Standby Master during operation When replacing a standby master during operation the following procedure is necessary to prevent an interruption on the network 1 Remov...

Страница 12: ...ting the 608MFX is in the active mode In other words the Ring master has failed and the standby takes over the data traffic RM Redundancy Manager green LED Status Meaning ON The 604 608MFX is operatin...

Страница 13: ...tate Port Status OFF No Valid Connection to the port Green Valid Connection to the port good link Flashes green once per cycle port switched to standby Flashes green three time per cycle port is disab...

Страница 14: ...return to their defaults as set in the factory This allows you to cancel settings made from the Web based management tools Telnet or the command line configurator serial port or the fault mask If the...

Страница 15: ...EEE 802 1Q Users must configure their networks so that no VLAN packets are sent IEEE 802 1P QOS The 600 Series does support QOS Users should configure their networks such that no packets with a priori...

Страница 16: ...ee Network Management Users guide The pin outs are shown below DSR Pin 6 RTS Pin 7 CTS Pin 8 Pin 9 Pin 1 RXD Pin 2 TXD Pin 3 DTR Pin 4 GND Pin 5 Standby Sync Port 608MFX Only A 9 pin female connector...

Страница 17: ...The following table shows the pin out and the connections for both types of cable PC Port 25 Pin 9 Pin 604 608MFX Female Female 9 Pin Female Signal Name Pin Pin Pin Signal Name TXD 2 3 2 RXD RXD 3 2...

Страница 18: ...rity 7 Verify that cabling is Category 5 or higher for 100Mbit TX Operation 62 5 125 m 1300nm for 100 Mbit FX Operation 8 Verify TX port 7 is connected to RX port 8 and vice versa 9 Verify that only o...

Страница 19: ...erature 40 C to 80 C Operating Humidity 10 to 95 Non Condensing Operating Altitude 0 to 6 500 ft Shock and Vibration Shock 200g 10ms Vibration 1g 10 500Hz Seismic 20g 5 200Hz 15s 3 axis Reliability MT...

Страница 20: ...rnet Switch ST Fiber Connectors 608MFX ST MM 2km 604MFXE ST YY Industrial Ethernet Switch ST Fiber Connectors 608MFXE ST YY Singlemode Where YY 15 40 or 80km URMK 19 Rack Mount Kit SDP1 Din Rail Power...

Страница 21: ...kaged appropriately for safe shipment Responsibility for loss or damage does not transfer to N TRON until the returned item is received by N TRON The repaired or replaced item will be shipped to the c...

Страница 22: ...SS OF BUSINESS LOSS OF INFORMATION OR DATA OR OTHER FINANCIAL LOSS ARISING OUT OF OR IN CONNECTION WITH THE SALE INSTALLATION MAINTENANCE USE PERFORMANCE FAILURE OR INTERRUPTION OF ITS PRODUCTS EVEN I...

Отзывы: