
Page
6
of
24
1.7
Installer Requirements
It is the responsibility of the installer to ensure they are compliant with Electric Vehicles (Smart Charge Points)
Regulations 2021. This includes, but is not limited to:
Installing only compliant charge points in private installs from and including 30
th
June 2022.
Answering the start-up wizard questions accurately to reflect actual install parameters.
Keeping a register of sales from and including 30
th
June 2022, for a minimum period of 10 years.
Having a Technical File and/or Declaration of Compliance available if requested by the customer
(
myenergi’s
Technical File and Declaration of Compliance is available at:
https://myenergi.com/guides/smart-charge-point-regulations-explained/
The installer should ensure they are fully aware of and understand how the regulations affect them and what
they are required to do to ensure they comply. These regulations should be monitored for any future updates.
For further information or to view the current Electric Vehicles (Smart Charge Points) Regulations 2021 visit:
https://www.legislation.gov.uk/ukdsi/2021/9780348228434
or
https://www.gov.uk/guidance/regulations-electric-vehicle-smart-charge-points
Further information can also be found by following the QR code below which will take you to
myenergi’s
Smart
Regulations webpage which contains reference documents, FAQs and simplified explanations of the
regulations.
https://myenergi.com/guides/smart-charge-point-regulations-explained/
Содержание ZAPPI-2H07TB
Страница 9: ...Page 9 of 24 ...