
Page
13
of
24
7.3
Status Screens
7.3.1
EV Disconnected
The EV is not connected to
zappi
.
In this example the last charging session delivered 20.8kWh of
energy to the EV and 80% of that energy came from the solar
panels.
7.3.2
Waiting for Surplus
zappi
is waiting for sufficient surplus power from the
microgeneration system. This screen will be shown in ECO+
mode as it is only in this mode that charging will stop if there is
not enough surplus power.
The house in the centre is straight-faced as grid electricity is
being used by the house (0.9kW in the example shown).
7.3.3
Surplus
Enough surplus is available and
zappi
is about to charge the EV.
A timer is decremented and can be set in the charge settings
(ECO+ mode only).
7.3.4
Waiting for EV
zappi
is waiting for the EV to respond; the EV is not ready to
accept charge.
7.3.5
Charge Delayed
The charging session has been delayed by the EV because a
scheduled charge has been set in the vehicle.
7.3.6
Paused
Содержание ZAPPI-2H07TB
Страница 9: ...Page 9 of 24 ...