13. COMMISSIONING AND ANNUAL MAINTENANCE TESTING 

Before commissioning the following checks and tests 

need to have taken place:

•   All the pipe work has been flushed through before 

fitting the valve and there are no leaks.

•   The supply pressures and temperatures are 

checked and all are in the range specified in these 

instructions.

•   The isolation valves and strainers are fitted and 

clean of any unwanted material and do not restrict 

flow.

•   The valve has been fitted to the pipework with all 

connections correctly tightened.

COMMISIONING PROCEDURE

1.  Ensure both isolation valves are fully open. Turn the 

temperature control to cold and turn the flow on.

   Check the temperature is at the required 

minimum. 

2.  Rotate the temperature controller gradually until 

it reaches the preset stop. Let it flow until the hot 

water has reached the valve and the temperature 

has stabilized. 

  Check the temperature is 38˚C +/-2˚C. 

   This is the factory preset. If the valve does not 

operate properly check and confirm that the hot 

and cold water supplies are fitted to the correct 

inlets.

3.  Override the temperature stop button by pressing 

the button and rotate to maximum being careful to 

avoid scalding. 

  Measure the temperature.

4.  The valve should then be checked to confirm the 

water isolation performs correctly. Run the valve at 

the 38˚C stop position. 

  Check the water temperature. 

5.  Turn off the feed of cold water using the isolation 

valve. 

  

The water flow should fall to a very low flow, 

(possibly only a drip) after a few seconds.

 

6.  Collect the water after 5 seconds and 30 seconds.

M

easure the temperature – it should be below 

46˚C +/- 2˚C . 

7.  Turn on the cold water again and

 it should return 

after a few seconds to stabilise to 38˚C +/- 2˚C

TEMPERATURE SETTING ADJUSTMENT

NOTE: Adjustment of the temperature settings is only 

to be carried out by a competent TMV engineer as it is 

a technically difficult operation in which the valve can 

easily be broken. 

1.  Remove the handle on the temperature controller, 

(noting carefully the assembly of the components).

2.  Rotate the internal stops a few degrees in the 

required direction.

3. Reassemble. 
4.  All the commissioning checks should be done 

again to ensure it now meets the required 

specification before using the shower.

Before use, ensure that you instruct all 

users in the safe operation of the shower 

as outlined in this document.

!

!

Содержание Options Concentric Petite

Страница 1: ...Fitting Instructions IMPORTANT This Step by Step guide should be retained after installation Options Concentric Petite Thermostatic Mixer Valve with Riser Rail...

Страница 2: ...uresystemsuptoamaximumof5barrunning pressure Themixervalvemustnotbesubjectedto watertemperaturesabove80 C Thismixervalveis alsosuitableforthermalstorage unventedsystems andpumpedgravitysystems IMPORTA...

Страница 3: ...components are included before starting the installation Description Quantity MixerValve 1 Handset 1 RiserRail 1 RiserRailFixing Brackets 2 HandsetHeightAdjuster 1 1 25mHose Washers 1 WallOutlet 1 Nu...

Страница 4: ...dent method of isolating the shower should maintenance or servicing be necessary these valves SHOULD NOT restrict the flow DO NOT operate the shower outside the recommended temperatures and pressures...

Страница 5: ...ar Thisshouldbeconfirmedbytheinstallation engineerorcompetentperson beforeinstallation WATER TEMPERATURE REQUIREMENTS Maximumhotwatertemperature 80 C Recommendedmaximum 65 C Minimumhotwatertemperature...

Страница 6: ...saredsymbol nexttotheinletandmustbeonthelefthandside If themixervalveyouarefittingiswithariserrailthe outletshouldpointdown ifthemixervalveisforan overheadtheoutletshouldpointupwards n Themixervalveis...

Страница 7: ...ngthepipework 3 Completethefittingofthepipeworkandthetiling leavingthepipeworkasshown about30mm outfromthefinishedsurface Fig3 4 Removethebackplatefromthemixervalveby removingtheretaininggrubscrews Pu...

Страница 8: ...peworkandthetiling leavingthepipeworkasshown Thewallplate shouldbeattachedfirmlybetween60mmand 75mmbelowthefinishedsurface Removetheback platefromthemixervalvebyremovingtheretaining screws Puttheplate...

Страница 9: ...henfitthe soapdish dampeningtherailwillmakeiteasierto slideon Finallyfitthehoseretainingringontothe bottomoftherailbelowthesoapdish Fig4 6 Replacetherailassemblyintothelowerbracket Refitthetopbracket...

Страница 10: ...ets 3 Overridethetemperaturestopbuttonbypressing thebuttonandrotatetomaximumbeingcarefulto avoidscalding Measurethetemperature 4 Thevalveshouldthenbecheckedtoconfirmthe waterisolationperformscorrectly...

Страница 11: ...evalveandcleanfilters 4 Showerheadblocked CleanShowerhead 5 Systemnotcapableofsupplyingmultipleoutlet atthesametime Reducesimultaneousdemand Checkstop servicevalvesarefullyopen Checkifenough waterpres...

Страница 12: ...thecustomer 2 Thisguaranteeispersonaltotheoriginalpurchaserofthe productandisnottransferable 3 Originalproofofpurchase s mustbeshownforanyclaim underthisguarantee 4 Thisguaranteedoesnotcoveranyproduct...

Страница 13: ...contactdetails andthepostcodewheretheunitisinstalled 2 TheMXGroupCustomerServiceDepartmentwill beabletotellyouwhetherthefaultcanbesimply rectifiedbytheprovisionofareplacementpart 17 SPAREPARTS Intheev...

Страница 14: ...NOTES...

Страница 15: ...NOTES...

Страница 16: ...CUSTOMERCARE 08455052211 TRADE DESCRIPTIONS ACT Variations in terms of colour finish materials and all other aspects of appearance may occur on occasions either through non availability of materials...

Отзывы: