background image

FRONT LINKAGE

MX R10

MX R16

User manual

Please read carefully before using MX

front linkage

UK 361905 AG -0919

Translation of the original manual

Содержание MX R10

Страница 1: ...FRONT LINKAGE MX R10 MX R16 User manual Please read carefully before using MX front linkage UK 361905 AG 0919 Translation of the original manual ...

Страница 2: ......

Страница 3: ...xtend its lifespan and work in complete safety The front linkage user manual is a very important document please keep it with you in order to be able to use it if required Leave it available to any other user and give it to the next owner of this front linkage Pictures and technical information included in this document may not correspond precisely to your front linkage but the working conditions ...

Страница 4: ......

Страница 5: ...EMENT HITCHING 12 8 IMPLEMENT DISCONNECTING 13 9 FOLDED ARMS POSITION 14 10 REAR SUPPORT 15 11 PUSH BAR 15 12 SHOCK ELIMINATOR 16 13 FRONT POWER TAKE OFF PTO 16 14 ADDITIONAL FRONT HYDRAULIC LINE 17 15 3 WAY SELECTOR 18 16 EXTERNAL CONTROL 19 17 ACCESSORIES 19 18 CONTROL 20 19 MAINTENANCE 21 20 TECHNICAL SPECIFICATIONS 22 According to equipment ...

Страница 6: ......

Страница 7: ... Rennes BP 83221 F 35690 ACIGNÉ The operator must read this manual before using the product for the first time Familiarise yourself with Safety and operating regulations Hitching and unhitching of the implement Full use of the controls ...

Страница 8: ...reventingthismovement is strictly forbidden Before moving the user must ensure that the front linkage is in good working order and can be used safely When driving on the road with a front implement the front linkage must always be in a raised position and the road regulations must be respected dimensions signalling on implement etc Whendrivingontheroadwithoutafrontimplement thefrontlinkagemustbese...

Страница 9: ...e The more compact the implement fixing the less strain there is on the equipment Use of a compact implement also improves the lifting performances For pushing work implements of the soil decompaction or dozer blade type for instance it is strongly recommended that a push bar be fitted to reinforce the tractor from the front linkage to the rear trumpet housings Caution Recommendations for fixing t...

Страница 10: ...9 rue de Rennes BP 83221 F 35690 ACIGNÉ 3 SAFETY STICKERS Safety stickers are located on the front linkage Keep them readable and clean and change them if damaged 4 IDENTIFICATION PLATE The identification plate is located on the right hand side of the headstock The serial number and front linkage type which are indicated on this plate might be requested when requiring spare parts or technical assi...

Страница 11: ...ion reserved 19 rue de Rennes BP 83221 F 35690 ACIGNÉ 5 DESCRIPTION 1 Right arm 2 Left arm 3 Arm pin 4 Linkage frame 5 Top link yoke 6 Top link bar 7 Lever locknut 8 Hitch yoke use a 30 mm diameter pin 9 Ram 10 Frame 11 Coupler 12 Ball end ...

Страница 12: ...stable area Pull the parking brake Turn off the engine 6 2 Leave the cab and remove the L H arm locking pin 6 3 Support the L H arm and remove the pin Caution This operation must be carried out by the driver who must leave the seat and ensure all manoevres are forbidden while he is working on the front linkage ...

Страница 13: ...rds to the desired position Position 1 Fixed position Position 2 Floating position Arm in floating position The implement follows the contours of the ground 6 5 Put the pin back in position and lock with the locking pin 6 6 Repeat the items 6 2 à 6 5 for the right arm 6 7 Open the stop valve Closed Open ...

Страница 14: ...ents from the front implement Lock the adjustment of the bar by means of the lever locknut Checking before work Test the lifting by checking that the tractor front implement combination works correctly Particularly check the space between the top link bar and the tractor s engine bonnet Check that all the pins and locking pins are fitted and locked correctly Check the locking status of the hitchin...

Страница 15: ...ke 8 2 Free the top link bar from the mast of the front implement 8 3 Reposition the upper link bar on to the front linkage frame 8 4 Unlock the hitching hooks and lower the linkage arms to release the implement Caution This operation must be carried out by the driver who must leave the seat and ensure all manoevres are forbidden while he is working on the front linkage ...

Страница 16: ...stable area Raise the front linkage arms Apply the parking brake and shut off the engine 9 2 Close the stop valve 9 3 Hold the R H arm and remove the pin Caution This operation must be carried out by the driver who must leave the seat and ensure all manoevres are forbidden while he is working on the front linkage Closed Open ...

Страница 17: ...T This structure is located under the tractor and it reinforces the tractor from the clutch bell housing to the rear trumpet housings 11 PUSH BAR This attachment is located under the tractor providingitwithoverallreinforcementfromthefront linkage to the rear trumpet housings This equipment is strongly recommended for any heavy pushing work e g plough soil decompaction implement dozer blade etc Acc...

Страница 18: ...and adapt the length of the transmission shaft between the implement and the front power take off The universal joint of the transmission shaft must be fitted with suitable protection complying with the standard ISO DIS 5673 1 Never lift or lower the front linkage with the power take off under load Check the a and ß angles of the implement s universal joint and the power take off Adjust the length...

Страница 19: ...off disengage it using the same switch located in the cab 14 ADDITIONAL FRONT HYDRAULIC LINE This supplies a hydraulic unit in front of the linkage 14 1 Connect the hydraulic hoses of the implement to the 1 2 female couplings Release the pressure in the hydraulic system to make connecting the hoses easier 14 2 Control the hydraulic line using the tractor s control valve or the MX control valve ref...

Страница 20: ...odeisusedmainlywhenhitchingupanimplement lowering linkage arms and for working the soil with a bulldozer blade for instance Description the rams on the MX front linkage are pressurised on both lifting and lowering Dothefollowing turntheleversasshowninthephotoopposite 15 3 Single acting operation Usage this mode is used mainly with a front end mowers or with an implement fitted with depth wheels De...

Страница 21: ...ring of the arms when hitching an implement A second external control can be fitted on the front linkage to operate another hydraulic function e g hydraulic top link 17 ACCESSORIES A number of attachments for MX front linkages are shown below Weight carrier triangle This attachment enables the tractor s original weights and weight carriers to be picked up According to equipment ...

Страница 22: ...lve fitted on the tractor Refer to the user instructions for the tractor 18 2 With the MX control valve 18 1 Raising and lowering the MX front linkage Move the MX monolever forwards or backwards 18 2 Controllingtheauxiliaryhydraulicline dependingonthefittings Move the MX monolever to the right and left In order to operate a second auxiliary hydraulic line press and hold the green button on the mon...

Страница 23: ...100 hours work at least once per year Drain the oil and replace the filter with a new genuine MX one see filter removal procedure below Next refill the housing with oil up to the level shown opposite Recommended oil type STOU Supper Tractor Oil Universal 10W30 ou 10W40 NOTE The oil level of the power take off unit must regularly be checked and topped up if required Oil filling plug Oil level Oil c...

Страница 24: ... 050 Kg Width between lifting arms 825 mm Lift arm height from ground in lowest position 1 200 mm in highest position 2 850 mm 850 mm Couplers Auto Cat 2 and 3N Balls end Cat 2 Top link length Cat 2 460 to 680 mm Front Power Take Off PTO Maximum PTO power 150 hp Front PTO shaft speed 1 000 rpm PTO shaft profile DIN 9611 1 3 8 6 splines Average data Variable according to the tractor specification O...

Страница 25: ...BB o PCS o LS o PG o Implemento para pala cargadora telescópica BMSA o CGA o BTA o TR o BCA o BCDA o Cazo distribuidor BD1202 o BD 1402 o BD 2002 o BD 2402 o BD 3102 o Manubal L o C30 o C40 o U40 o V40 o V50 o V60 o V500 o W500 o V7000 o Tripuntal delantero R05 o R08 o R10 o R12 o R16 o R20 o R28 o R38 o R53 o Contrapeso M250 o M400 o MM600 o MM900 o MM1200 o MM1500 o MM400AD o MBX cuyo número de ...

Страница 26: ......

Страница 27: ......

Страница 28: ...19 rue de Rennes BP 83221 F 35690 ACIGNE Tél 33 0 2 99 62 52 60 Fax 33 0 2 99 62 50 22 E mail contact m x eu ...

Отзывы: