11. FITTING THE VERTICAL RAIL AND HANDSET (CONT.)
7. Replace the revolving nut ensuring the rubber
O-ring seal is in place. Hand tighten using the key.
8. The vertical rail is telescopic, unscrew the locking
nut being careful not to damage the chrome plating.
Pull the inner tube out from the outer one to the
required length.
9. Attach the overhead rail to the vertical rail and
screw until hand tight. The ‘O’ ring provides a seal
so it does not need to be overtightened (Fig 6).
NOTE: Ensure the locking washer is on the vertical
rail and do not tighten the locking nut between the
two vertical tubes until the vertical rail has been
completely fitted if desired it can be tightened at the
desired height for use.
10. Screw the overhead rail assembly to the top of the
diverter valve making sure the washer is fitted.
Locate the overhead rod into the wall bracket
and tighten the locking screw using the allen key
supplied (Fig 7).
NOTE: There is a small amount of depth adjustment
within the collar. Adjust the depth of the bracket
before securing in place to the mounting plate.
11. Screw the large fixed showerhead to the overhead
assembly. Make sure the sealing washer is in
place and screw tight to seal the joint (Fig 8).
12. Connect one end of the shower hose to the
diverter on the mixer valve, making sure that the
sealing washer is in place. Screw the remaining
end of the shower hose to the showerhead then
locate the showerhead into the height adjuster
(Fig 9).
7
6
8
9
Содержание Atmos Energy
Страница 15: ...NOTES...