
42
NP 085.70.69 - 01/06
Engine preparation to return to operation
Before starting an engine which has been inactive for a long time, take the following cautions:
.
Perfectly clean all the outer parts.
2.
Close all engine block and radiator drain plugs and fill cooling system with clean water. Check it for leakages.
3.
Turn the fan by hand to assure the water pump seals are free.
4.
Install fan belt and adjust its tension.
5.
Remove valves cover, lubricate rocker arms with engine oil and install it again.
6.
Clean and install air filter and intake duct, remove the adhesive tape from intake and exhaust manifolds.
7.
Install exhaust pipe.
8.
Pressurize the engine oil galleries with oil (50/60 lbf/in.²) and turn crankshaft by hand in order to detach it from
bearing shells. Depressurize the system and remove pressurization tank.
9.
Connect the battery(ies):
Atenção:
Do not invert cables position in relation to battery poles during terminals connection.
First connect positive terminal.
Содержание MS 3.9L
Страница 1: ...Operation and Maintenance Manual Operation and Maintenance Manual MS 3 9l MS 3 9l Engines...
Страница 7: ...5 NP 085 70 69 01 06 NOTES...
Страница 11: ...9 NP 085 70 69 01 06 Engines View Engine MS 3 9T Illustrative picture subject to changing...
Страница 20: ...18 NP 085 70 69 01 06 NOTES...
Страница 37: ...35 NP 085 70 69 01 06 4 Loosen the fuel injection pump head bleeding bolt 3...
Страница 48: ...46 NP 085 70 69 01 06 NOTES...
Страница 49: ...47 NP 085 70 69 01 06 NOTES...
Страница 50: ...48 NP 085 70 69 01 06 NOTES...
Страница 53: ...NP 085 70 69 ASC Comunica o T cnica www asccomunicacao com br Produced by...