CAT990 - NLFREN - v1.0 - 21022017
EN
20
Page 6 of 12
Step<3>:
1.Please place the upper cabinet on the assembled Step<2> as figure. Please notice that front of upper
cabinet should be put to face leg B.
2.
Opening the double folded door, combine the upper cabinet, big funnel & bracket in one whole by
22pcs M6*16 round head screws and faced washers.
Step<4>:
1. Taking 4pcs M6*12 big brazier head screws, & M6 flange nuts to mount the dust collector at the
backboard of upper cabinet. Electric Wire of assembled dust collector plug into the socket of switch box
through the slot of right board of upper cabinet,
2. Mounting pressure regulating valve etc. on the leg B. & connecting the orange air hose of foot valve
Page 6 of 12
Step<3>:
1.Please place the upper cabinet on the assembled Step<2> as figure. Please notice that front of upper
cabinet should be put to face leg B.
2.
Opening the double folded door, combine the upper cabinet, big funnel & bracket in one whole by
22pcs M6*16 round head screws and faced washers.
Step<4>:
1. Taking 4pcs M6*12 big brazier head screws, & M6 flange nuts to mount the dust collector at the
backboard of upper cabinet. Electric Wire of assembled dust collector plug into the socket of switch box
through the slot of right board of upper cabinet,
2. Mounting pressure regulating valve etc. on the leg B. & connecting the orange air hose of foot valve
Step 3
1.
Please place the upper cabinet on the assembled Step 2 as figure. Please notice that front of upper cabinet should be
put to face leg B.
2. Opening the double folded door, combine the upper cabinet, big funnel & bracket in one whole by 22 pcs M6x16
round head screws and faced washers.
Step 4
1.
Taking 4 pcs M6x12 big brazier head screws, and M6 flange nuts to mount the dust collector at the backboard of
upper cabinet.
2. Electric wire of assembled dust collector plug into the socket of switch box through the slot of right board of upper
cabinet.
3. Mounting pressure regulating valve on the leg B and connecting the orange air hose of foot valve switch to the side
hole of right big funnel, then connect it to the sandblast gun.
4. Please place the left / right grid in the upper cabinet.
5. Remove the sandblaster to the right position by forklift, then remove the reinforce of front leg.