background image

Installation, Operation and Care of 

12  QT MIXER 

+ SA VE THESE INSTRU

GENERAL 

This Mixer is an advanced design, highly reliable professional food processing tool, and is ideal for mixing 
all types of dough, as well as eggs, cream, mayonnaise, etc. 

This model Mixers  are equipped with powerful. 1/2  HP motors and  strong gear drive design.  The gears 
are made of heat-treated alloy  steel  and  a  hardness  steel  worm wheel.  There  are  3  speeds  and various 
style  attachments,  which can be selected to obtain the best using  food,  are made  of alloy  aluminum  or 

they're with hygiene standard. 

A stainless steel safety guard is  standard on  model AX-M12.• 

I f  your operation and maintenance are correct,  then it will give you years of service,  and obtain the best 
using result. 

INSTALLATION 

UNPACKING 

Immediately after unpacking the mixer,  check it for possible shipping damage.  I f  this machine is found to 
be  damaged  after unpacking,  save the packaging  material  and  contact the carrier immediately.  Prior to 
installation,  test the electrical  service to assure it  agree with the specifications  on the machine data plate 

located on the backside of the pedestal. 

LOCATION 

Place the mixer in  its operating location.  Bench should 

be 

placed on a sturdy level  surface.  There should 

be adequate space around the mixer for the user to operate the control and install and remove bowls. 

Holes  are provided  in  the base to permanently secure the mixer,  although this  not  necessary  in  normal 
installations.  Floor models must be leveled front-back and side-to-side by sliding shims under the legs  as 
required. 

Содержание Axis AX-M12

Страница 1: ...ount Ave Montreal QC H4P2P9 Tel 514 737 9701 888 275 4538 Fax 514 342 3854 877 453 8832 12000 Biscayne Blvd Ste 108 Miami FL 33181 Tel 786 600 4687 844 218 8477 Fax 786 661 4100 sales mvpgroupcorp com www mvpgroupcorp com ...

Страница 2: ...hen it will give you years of service and obtain the best using result INSTALLATION UNPACKING Immediately after unpacking the mixer check it for possible shipping damage If this machine is found to be damaged after unpacking save the packaging material and contact the carrier immediately Prior to installation test the electrical service to assure it agree with the specifications on the machine dat...

Страница 3: ...MPERATIVE THAT THE OUTLET TO WHICH THIS PLUG rs CONNECTED BE PROPERLY GROUNDED IF THE RECEPTACLE rs NOT THE PROPER GROUNDING TYPE AN ELECTRICIAN SHOULD BE CONTACTED INSTALLATION DIAGRAM mm 388 5 Model No Bowl Capacity AX M12 12 Qt c o M 499 445 499 Motor for Agitator 0 5HP 2 l 1 J Agitator speeds R P M 515 262 146 ELECTRICAL 110V 60HZ l PH ...

Страница 4: ...ed is for light dough which must rise quickly heavy batters and some whipping operations O Speed 3 high This speed is fast speed for light work such as whipping cream beating eggs and mixing thin batters AGITATOR 10 7 8 6 11 To install an agitator figure 1 5 the bowl Figure 1 6 must be installed and fully lowered Place the J agitator in the bowl push it up on the agitator shaft and tum it clockwis...

Страница 5: ...w mixer s bowl Figure 1 6 and agitators beaters whip and dough arms should be thoroughly washed with hot water and mild soap solution rinsed with either a mild soda or vinegar solution and thoroughly rinsed with clean water BEFORE being put into service This cleaning procedure should also be followed for bowls and agitators before whipping egg whites with or whole eggs CONTROL PANEL Figure 1 11 ON...

Страница 6: ...d be contacted Use ofunproved grease oflubricants may lead to damage and void the u ut s warranty The bowl lift slidways Figure 1 1 should be lubricated semi annually or more often under heavy usage Disconnect the unit from the power supply before removing the top housing or apron The drip cup Figure 1 4 or safety guard should be inspected periodically for moisture or lubricant dripping Remove the...

Страница 7: ...z u s WIRING DIAGRAM AC IN AC IN CONTROL PANEL CONTROL PANEL CONTROL PANEL CONTROL BOX L SW SHIFT L SW 6 M1 LS2 LS2 LIFTER L SW GUARD L SW ...

Отзывы: