![MVE 21135284 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/mve/21135284/21135284_quick-reference-manual_1860766009.webp)
MVE FUSION Quick Reference Guide
9 – 21205647 D
Fusion Dewar Plumbing Connections
Procedure for the First Fill
1.
Do not power on the Fusion until all steps are followed.
2.
Make sure to have two, 230-liter liquid nitrogen cylinders at 22-35PSI for the first fill.
3.
Load racks and empty boxes or alternate inventory systems into the MVE Fusion.
NOTE: VERY IMPORTANT TO ADD RACKS AND BOXES BEFORE FILLING.
CAUTION: Venting may occur which will result in a loss of cryogen inside the pressure vessel
if warm racks are installed after the Fusion’s first fill and/or if more than 1, 2, or 3 warm
racks are installed during its subsequent operation. Be prepared to have a 230-liter liquid
nitrogen cylinder @ 22-35psi to refill pressure vessel if this occurs.
Vent Valve
Pressure Relief Valve
Fill Valve
Содержание 21135284
Страница 1: ...MVE Fusion Series...
Страница 16: ...MVE FUSION Quick Reference Guide 16 21205647 D NOTES...