![MVE 21135284 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/mve/21135284/21135284_quick-reference-manual_1860766013.webp)
MVE FUSION Quick Reference Guide
13 – 21205647 D
12.
Once LN2 begins to flow steadily out of the vent valve muffler, first shut off the Fusions vent
valve, then shut off its fill valve. Lastly, shut off the fill valve on the LN2 supply tank.
13.
Open both Isolation valves.
NOTE:
The inner pressure should fill in about 35 to 45 minutes (using a supply source of 22-
35PSIG)
14.
The freezer’s pressure relief valve will begin releasing gaseous nitrogen as the liquid boils off
and the pressure builds (above 50 PSIG) inside of the storage tank. As the internal chamber
and storage racks come down to temperature the “relief” events will decrease.
15.
Once all the steps above have been completed the MVE Fusion can be powered on by
flipping the main power switch to the on position followed by flipping the BB Enable/Disable
(backup battery) switch to the on position. The Fusion’s main screen will automatically turn
on. Below shows the default LCD startup order. No programming is required for the first fill.
MVE Fusion Default Password
: Fusion01
1*
2*
3*
4*
16.
To turn off the MVE Fusion freezer simply flip the main power and the backup battery
switches located on the back of the Fusion to the off position.
Содержание 21135284
Страница 1: ...MVE Fusion Series...
Страница 16: ...MVE FUSION Quick Reference Guide 16 21205647 D NOTES...